Similar Projects
Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Corkscrew Water Treatment Plant Filter Air Supply System Modification
Alteration
Bidding
Fort Myers, FL 33913

Fort Myers High School HVAC Upgrades
Post-Bid
Fort Myers, FL 33901

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Controlled Humidity Protection System Services
Results
Avon Park, Bradenton, Fort Myers, Palmetto, Saint Petersburg, West Palm Beach, FL

City Hall Police Wing HVAC System Replacement
Results
Less than $150,000 est. value
Sanibel, FL 33957

HVAC and Controls Renovation for Cape Elementary School
Construction
Fort Myers, FL 33904

Continuing Contract - Civil Engineering Services
Post-Bid
Fort Myers, FL

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

HVAC and Mechanical Products
Term Contract
Post-Bid

Building Official Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Construction Management Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

FL-J.N. Darling NWR HVAC Maintenance
Post-Bid
Sanibel, FL 33957

Rooftop Unit (RTU) Replacement
Results

Reported 08/26/2021 12:00 AM
Project Title

Air Handler Replacement

Physical Address View project details and contacts
City, State (County) FL 33919   (Lee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes but is not limited to: Demolition of existing AHU and all duct work in mechanical room. Chilled water will have to be disconnected and reconnected to units. All new controls and controls system for new unit. New VFD, demolition of existing VFD. Steel rack and railing system to be removed entirely. All trash to be removed by HVAC contractor. Daily cleaning to be done on site by HVAC contractor. All electrical work to be done by HVAC contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents