Similar Projects
Contract "B" Water Well Improvements
Infrastructure
Post-Bid
Charleston, MS

Drilling and Constructing a Gravel Wall Water Well
Infrastructure
Bidding
Roxie, MS

750 GPM Water Well and Appurtenances
Infrastructure
Post-Bid
Raleigh, MS

12" Hydraulic Storm Water Pumping System
Infrastructure
Bidding
Starkville, MS

Grinder Pump Systems Commodity FY22
Infrastructure
Post-Bid
Brandon, MS

2019 Water System Improvements Contract III - Water Supply Improvements
Infrastructure
Bidding
MS

Contract A Dorothy Street and Depot Street Waterline Replacement and Contract B Industrial Park Well Repairs
Infrastructure
Post-Bid
Charleston, MS 38921

Remove the Existing Gas and Diesel Pumps
Term Contract
Post-Bid
Pascagoula, MS 39568

2019 Alcorn County CDBG Biggersville Well
Results
MS

Gore Springs Water System Improvements - Contract B - 400 G.P.M. Water Well
Infrastructure
Results
Gore Springs, MS

Drain Maintenance Services, G.V. "Sonny" Montgomery VA Medical Center, Facilities Management Service Jackson, MS 39216
Term Contract
Post-Bid
Jackson, MS 39216

New 400 GPM Water Well
Post-Bid
Foxworth, MS

2019 CDBG Glen Well
Results
Corinth, MS

Contract 2 Water Well - Drinking Water System Improvements
Renovation
Results
$885,000 est. value
Lucedale, MS

Test Holes and Test Wells mTrade Park
Infrastructure
Results
$264,000 est. value
Oxford, MS 38655

Last Updated 09/20/2021 03:41 PM
Project Title

Provide and Install 2 Pumps and Motors

Physical Address View project details and contacts
City, State (County) Mississippi City, MS 39762   (Harrison County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace two existing boiler circulation pumps and motors for the Harned Building at ARS MS State. Project Objective: The objective of this project is to replace boiler circulation pumps that supply the heating system for Building 1 (Harned Building) at ARS MS State. This Project is located within Bldg. #1, USDA-ARS MS State, 150 Twelve Lane, MS State, MS 39762.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents