Similar Projects
Top Crop Cultivation Warehouse
New Construction, Addition - 38,000 SF
Conception
Las Cruces, NM

Top Crop Cannabis Store
Renovation
Conception
Sunland Park, NM

Rehabilitation of a Maintenance Facility
Renovation
Bidding
$128,625 CJ est. value
Anthony, NM 88021

Schwazze TI (White Sage Bldg 6)
Renovation - 1,650 SF
Bidding
$150,000 CJ est. value
Las Cruces, NM 88012

Pur Life Retail
Renovation - 1,860 SF
Post-Bid
Las Cruces, NM 88001

Walmart Neighborhood Market #5782-214 - SPRB-R
Renovation - 41,117 SF
Post-Bid
Las Cruces, NM 88011

Walmart Supercenter #5155-255 - CSP
Renovation - 206,524 SF
Construction
$591,303 est. value
Las Cruces, NM 88005

Walmart Supercenter #4601-234 - CSP
Renovation - 189,543 SF
Construction
$533,175 est. value
Las Cruces, NM 88011

Top Crop Retail - Sunland Park
Renovation
Conception
Sunland Park, NM

Tractor Supply
Renovation - 18,703 SF
Post-Bid
Las Cruces, NM 88005

Everest TI - Las Cruces
Renovation - 1,650 SF
Construction
$150,000 CJ est. value
Las Cruces, NM 88012

Top Crop Dispensary / Sunland Park
Renovation
Conception
$500,000 est. value
Sunland Park, NM

Ross #2404 TI / Las Cruces
Renovation - 17,630 SF
Post-Bid
$500,000 CJ est. value
Las Cruces, NM 88001

Las Cruces - World Peace Smoke Shop TI
Renovation - 3,000 SF
Construction
$115,000 CJ est. value
Las Cruces, NM 88012

Las Cruces - Brazito Plaza Lease Space Improvements (Ross Landlord Work)
Infrastructure
Post-Bid
$350,000 CJ est. value
Las Cruces, NM 88001

Last Updated 08/28/2023 03:04 PM
Project Title

Building 5 Landlord TI

Physical Address View project details and contacts
City, State (County) Las Cruces, NM 88012   (Dona Ana County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Tenant Improvement of a new retail shell building including but not limited to mechanical, electrical, plumbing, concrete reinforcing, concrete form work, wood framing and lumber. As of August 28, 2023, construction commenced earlier this month. All trades have been contracted. Construction completion is expected to take sixty days. *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, 3,518 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents