Similar Projects
New Performing Arts Building
New Construction
Conception
Rio Grande City, TX

New Sale Park Pavilion Construction
New Construction - 2,100 SF
Conception
$500,000 est. value
Bryan, TX 77803

American Pavilion Renovation
Renovation
Design
College Station, TX

City Center
New Construction
Design
$5,400,000 est. value
Georgetown, TX

Parks Maintenance Building
New Construction - 15,000 SF
Bidding
$4,254,552 est. value
Missouri City, TX 77489

Canopy Addition - Levitt Center
Addition
Bidding
$70,000 est. value
Arlington, TX 76013

Athletic Fields Renovation and Construction
Post-Bid
Dallas, TX

Shalom Record Studio
New Construction - 4,997 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Edinburg, TX 78539

5 Points Plaza Enhancement Pavilion and Restroom
New Construction
Results
La Porte, TX 77571

Telescopic Gym Bleacher Repair Services
Results
Less than $19,500 est. value
La Joya, TX

New Restroom and Concession Building at BMX Park
New Construction
Construction
DeSoto, TX 75115

Headquarters (HQ) Replacement Phase 1 at Tyler State Park
Construction
$3,278,000 est. value
Tyler, TX 78744

Forest Park Pool Renovation
Renovation - 6,875 SF
Conception
$7,500,000 est. value
Fort Worth, TX 76110

Arts, Culture & Events Center
New Construction - 45,000 SF
Design
$14,000,000 est. value
Edinburg, TX

Purchase of Replacement Cabin for Quintana Beach County Park
Renovation
Bidding
Quintana, TX 77541

Reported 06/21/2022 03:41 PM
Project Title

Cyclebar Tenant Up-Fit-Star Park / Irving

Physical Address View project details and contacts
City, State (County) Irving, TX 75039   (Dallas County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected June 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An architect has been selected. As of June 17, 2022 the tenant has selected a general contractor but has not yet finalized a contract. General contractor information has not been disclosed. Construction is anticipated to begin early third quarter 2022.

Details

Misc. Recreational, Approximately 2,368 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents