Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lions Central Park Splash Pad
New Construction
Post-Bid
Rogers, MN 55374

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Bde Maka Ska Park Pavilion/Refectory
New Construction
Results
Minneapolis, MN 55408

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Ridgedale Commons and Crane Lake Preserve
New Construction, Infrastructure
Post-Bid
Minnetonka, MN 55305

Grading, Bituminous Surfacing, ADA Improvements and Signal
Results
MN

Bde Maka Ska Refectory
New Construction, Infrastructure
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Seven Points Uptown
New Construction, Infrastructure, Renovation - 172,000 SF
Pending Verification
$150,000,000 CJ est. value
Minneapolis, MN 55408

TSG Senior Apartments
New Construction, Infrastructure - 300,000 SF
Post-Bid
Golden Valley, MN 55422

Last Updated 02/01/2023 01:11 PM
Project Title

Bassett Creek Park Off Leash Dog Area and Pedestrian Bridge Improvements

Physical Address View project details and contacts
City, State (County) Crystal, MN 55422   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $558,007 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the furnishing of all labor, materials, and all else necessary for construction of the Bassett Creek Park off leash dog area, parking lot, and installation of a pedestrian bridge. In general, work consists of all labor and materials for construction complete in-place, including, but is not limited to, general earthwork, concrete pavement, concrete curb, concrete abutments, prefabricated bridge installation, asphalt paving, utilities, fencing, landscaping, seeding, and site restoration. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification and other requirements of the statute is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. Direct inquiries to Landscape Architect's Project Manager Ken Grieshaber at kgrieshaber@srfconsulting.com or 763.249.6709. Questions will be received until 4:00 pm, January 24th, 2023. Bid Security in the amount of 5 percent of the amount of the bid must accompany each bid in accordance with the Instructions to Bidders. The provisions of the documents constituting the Contract shall be read together and reconciled to the greatest extent reasonably possible. To the extent there are any conflicting provisions that cannot be reconciled, the more specific provision shall generally be controlling. To the extent the conflicting provision is contained in the Special Contract Provisions (Exhibit G) or in the General Requirements and Covenants (Exhibit F), the provisions contained in such documents shall be controlling. Start construction on or after April 17, 2023 (a) Substantial completion on or before July 28, 2023. (b) Final completion on or before August 11, 2023. (c) Ready for final payment on or before August 25, 2023.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents