Similar Projects
Elm Creek North Phase Three Paving, Drainage, Water and Wastewater Improvements
Bidding
TX

FY20-1 Maintenance Project
Bidding
Austin, TX 78750

Cold Mix Asphalt and Parking/Road Striping Services
Term Contract
Post-Bid
Austin, TX 78759

El Malino Dr. and Bellemeade Blvd. Pavement Rehabilitation
Post-Bid
Less than $318,249 est. value
Pflugerville, TX 78660

Southern Region Disaster Recovery Support BPA
Results

Miscellaneous Streets Slurry Seal and Fog Seal IDIQ(CIP )
Term Contract
Results
$8,000,000 est. value
Austin, TX

Florence Asphalt Overlay
Bidding
Austin, TX 78773

Provence Phase 1, Section 3A
Post-Bid
Bee Cave, TX 78733

Lazy Nine Municipal Utility District 1B, Sweetwater Section 2, Village Z3
Results
Austin, TX 73301

Typhoon Texas Water Park Access Modification
Post-Bid
Pflugerville, TX 78660

Asphalt Parking Lot/Roads Construction, Rehabilation and Repair IDIQ(CIP)
Term Contract
Results
Less than $2,000,000 est. value
Austin, TX 78704

Caughfield Phase Ten Paving, Drainage, Water Wastewater Improvements
Post-Bid
Austin, TX 78728

Skidabrasion Texturing
Results
Less than $553,402 est. value
TX

183A Phase III Project – Construction Engineering & Inspection Services
Post-Bid
Less than $180,000,000 est. value
Austin, TX 78705

Thomas Springs at Circle Drive Left Turn Lane
Results
Less than $525,000 est. value
Austin, TX 78767

Last Updated 04/09/2021 09:26 AM
Project Title

2021 Street Rehabilitation Lohman Ford Road HMAC Overlay

Physical Address View project details and contacts
City, State (County) Lago Vista, TX 78645   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: 2” Overlay and tac coat of one main City street approximately 90,035 square yards. Project consists of removing reflective traffic buttons, implement traffic control as approved by the City, apply tac Coat, and 2” overlay, temporary lane markers, and 4-weeks after application vacuum sweep entire roadway, and complying with city construction specification in addition to design drawing notes. Added Bid Alternate1: Install 12” HMAC tapered edge beyond the limits of overlay. And, mill out ¼” inch (leveled) of asphalt for traction at certain areas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents