Similar Projects
Greenfield Water Main Extension
Infrastructure
Post-Bid
Fitchburg, WI

Hydrants
Infrastructure
Post-Bid
Madison, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Curb Boxes
Infrastructure
Post-Bid
Madison, WI

North Main Street Watermain Replacement
Results
$300,000 est. value
Verona, WI 53593

Ductile Iron Pipe
Infrastructure
Post-Bid
Madison, WI

Village of Dane Southeast Public Works Loop
Results
Dane, WI

Valve Boxes
Infrastructure
Post-Bid
Madison, WI

Chicory Way, Juniper Street and Aspen Place Reconstruction
Results
$25,000,000 est. value
Sun Prairie, WI

Gate Valves
Infrastructure
Post-Bid
Madison, WI

Pit C to Pit M Steam Pipe Replacement
Results
$220,000 est. value
Oregon, WI 53575

Water Main Fittings and Accessories
Infrastructure
Post-Bid
Madison, WI

Lathrop Drive Utility Replacement - Phase II -GPC
Results
Less than $14,000,000 est. value
Madison, WI

Tapping Sleeves
Infrastructure
Post-Bid
Madison, WI

Last Updated 08/23/2021 10:06 AM
Project Title

Primate Center Chilled Water Extension - GPC

Physical Address View project details and contacts
City, State (County) Madison, WI 53774   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,130,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general,the work consists of underground chilled water supply and return piping (8” diameter) to be connected to existing 14” diameter chilled water supply and return piping (CHWS/R) near the northwest corner of North Charter Street and Capitol Court. The 8”diameter CHWS/R piping will be extended west on Capitol Court to serve the Wisconsin Primate Center (285-0A-0526. The eight- inch diameter CHWS/R piping will be extended into the Wisconsin Primate Center. The CHWS/R piping will include manual shut-off valves, with valve boxes exterior to the building and will include manual shut-off valves interior to the building

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents