Similar Projects
Reported | 01/15/2022 12:00 AM |
Project Title | Remodeling and Repairs at 2632 North 23rd Street |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53206 (Milwaukee County) |
Category(s) | Residential |
Sub-Category(s) | Single-Family Homes |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected February 2022, Construction Completion Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace front service walk concrete steps to front porch. Install pipe handrails to both concrete service walk steps. Remove large tree in backyard, grind tree stump below ground level, fill and seed. Remove brush on north fence line and north side of garage. Tear off/re roof garage. Repair damaged roof boards, synthetic underlayment and metal drip edge. Repair damaged or replace missing soffit and fascia boards. Install aluminum trim on door, soffit, fascia and gable ends. Install pre-hung steel panel service door, with hardware. Install vinyl siding to garage. Board over back window and side over. Tear-off/re roof house. Replace any damaged roof boards, install O.S.B shielding if needed, install ice and water shield, 3 feet of all roof edging, synthetic underlayment, metal drip edge, metal valley and chimney flashing, install ridge vent and 30 year dimensional shingles. Install gutters and downspouts. Discharge downspout in yard if possible. Cap off receivers. Install vinyl replacement window on 2nd floor per MHD specifications with final lead clearance. Replace front porch, steps, rails, stringers, latice, framing to code, guardrails with 1 "x3" balasters, new box beam for support of 2nd floor porch rafters, decking, trim, 2nd floor rubber roof deck, install porch ceiling and light fixture and switch. Install vinyl siding with building wrap on house. Install storm door and pre hung steel panel Entry door with hardware. Replace rear kitchen door with knob and lock. Match existing door style, replace kitchen base and wall cabinets with countertop. Install and stainless steel kitchen sink and faucet, with trap and drain. Install rubber stair tread on back stairwell from back door to 2nd floor. Replace tub faucet and shower head. Replace bathroom vanity, sink, faucet and trap. Close off opening above stair knee wall to ceiling. Replace laundry tray faucet, automatic washer connections trap. Repair damaged concrete floor. Install GFIC outlet at laundry, all bathrooms, and kitchen counter area. |
||||||||||||||||||
Details | Single-Family Homes, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |