Similar Projects
Frey Branch Cottages
New Construction, Infrastructure
Conception
$11,300,000 CJ est. value
White House, TN 37188

Frey Branch Cottages
New Construction, Infrastructure
Conception
$11,300,000 CJ est. value
White House, TN 37188

Demolition/Renovation of City Hall - City of White House
Demolition, Renovation, Infrastructure
Design
$500,000 CJ est. value
White House, TN 37188

Apache, Hobbs and Villages Court Box Culverts - City of White House
Infrastructure
Design
$1,000,000 CJ est. value
White House, TN 37188

Woodall Playground Expansion Project
Infrastructure
Bidding
$2,000,000 CJ est. value
White House, TN 37188

J. Travis Price Park Parking Lot Expansion
Infrastructure
Bidding
$90,000 CJ est. value
Springfield, TN 37172

RS-2 Seal and Emulsified Asphalt
Term Contract, Infrastructure
Post-Bid
Springfield, TN 37172

Hot Asphalt Paving and Maintenance for Robertson County Highway Department
Infrastructure
Post-Bid
TN

Four City Streets Paving
Infrastructure
Results
Ridgetop, TN

The On-Call Concrete Pavement Repair at Various Locations on Various Interstate and State Routes
Infrastructure
Results

Pinson Pointe Townhomes / White House
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
White House, TN 37188

Construct Fire Station #3 - City of White House
New Construction, Infrastructure
Conception
$3,500,000 CJ est. value
White House, TN 37188

New Southern Force-Main (18-inch) Phase-2 - City of White House
Infrastructure
Design
$1,100,000 CJ est. value
White House, TN 37188

William A Batson Parkway Construction
Infrastructure
Bidding
$3,000,000 CJ est. value
Springfield, TN 37172

Paving and Sealing
Term Contract
Post-Bid
Portland, TN

Last Updated 09/08/2022 04:39 PM
Project Title

Fabco Drive Manufacturing Addition

Physical Address View project details and contacts
City, State (County) Springfield, TN 37172   (Robertson County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Gas Station, Industrial Warehouse, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 8, 2022 the project is in planning stage. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the second quarter of 2023.

Details

1 Story Above Grade, 30,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents