Similar Projects
Last Updated | 12/02/2020 12:31 PM |
Project Title | Replacement of the Existing Single Span Structure |
Physical Address | View project details and contacts |
City, State (County) | Bourbon, IL (Douglas County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $325,136 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of the existing structure, replacement with a new, single span PPC deck beam bridge supported by steel H piles, new bridge railing, aggregate approaches, and related roadway and earthwork construction. New single span 33" deep PPC deck beam bridge (1,868 SFT), Concrete Structures (22.0 CYD), Furnishing and Driving Steel Piles HP 12x53 (430 FT), Reinforcement Bars (2,900 POUNDS), Structure Excavation (174.2 CYS), Controlled Low-Strength Material (71.7 CYS}, Stone Dumped Riprap, CL A4(273.8 Ton), Traffic Control & Protection, Special (1 LSUM), and other items of related construction. |
||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |