Similar Projects
2018-19 Snow Removal Hired Equipment
Term Contract
Post-Bid

Kitchen Equipment Preventative Maintenance and Repairs
Term Contract
Post-Bid
Richmond, VA

Snow Plows and Auger Spreader
Results
Richmond, VA

Electric Scissor Lift and Trailer
Results
Richmond, VA

Kitchen Equipment for Chesterfield County Public Schools
Post-Bid
VA

Aerial Lift Truck for Hampton Roads
Term Contract
Results

Backhoe, Tractor Loader
Term Contract
Post-Bid

Roof Repair and Crane Replacement at Byrd Park Pump Station
Term Contract
Results
$500,000 to $600,000 est. value
Richmond, VA 23221

Clean and Repaint the Softball and Baseball Scoreboards
Post-Bid
Chesterfield, VA 23806

Kubota Backhoes
Results
Richmond, VA

Removal of Existing Water Coolers and Installation of New Coolers/Bottle Fillers at the Headquarters Building
Post-Bid
Richmond, VA 23235

Compact-Crane Lift System
Results

Snow Blower Loader Mounted
Term Contract
Post-Bid

Moving Services
Term Contract
Results
Richmond, VA 23220

Bellevue Elementary School Convection Steamer
Post-Bid
Richmond, VA

Reported 01/04/2019 12:00 AM
Project Title

Construction Simulators

Physical Address View project details and contacts
City, State (County) Chesterfield, VA   (Chesterfield County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Purchase for Forklift, Bulldozer, Backhoe and Welding Simulators. These simulators will be used as part of a Post-Secondary Heavy Equipment Program, which is aligned with the National Center for Construction Education and Research (NCCER), which is one of the industry standard certifications recognized by employers. This program will be designed to help residents gain the practical skills and training to become a certified Forklift, Bulldozer, Backhoe and Welding operator, which could lead to gainful employment upon the residents release which by way, reduces the recidivism rate of their return after release
Details
Division 11 - Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents