Similar Projects
Waco Boats Manufacturing Plant
Addition
Conception
Little Rock, AR 72206

Standard Lithium Extraction Plant
New Construction
Conception
$100,000,000 est. value
El Dorado, AR

Simmons Foods Processing Facility and Storage Yard
New Construction, Addition
Design
Siloam Springs, AR 72761

Simmons Foods
Addition - 65,000 SF
Design
$100,000,000 est. value
Van Buren, AR 72956

Marshalltown Tools Addition
Addition, Demolition, Infrastructure - 48,000 SF
Pending Verification
$26,000,000 CJ est. value
Fayetteville, AR 72701

Maverick Addition
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Little Rock, AR 72117

South Coast Baking Expansion
Addition, Infrastructure - 90,575 SF
Conception
$48,600,000 CJ est. value
Springdale, AR 72762

PotlatchDeltic Sawmilll
Addition
Design
$131,000,000 est. value
Waldo, AR 71770

Westrock Coffee Company / Conway
New Construction, Renovation - 530,000 SF
Pending Verification
$70,000,000 CJ est. value
Conway, AR 72034

ProFab of Northwest Arkansas Expansion
New Construction, Infrastructure - 10,000 SF
Conception
$5,400,000 CJ est. value
Springdale, AR 72764

Delta Peanut Cold Storage Facility
New Construction, Infrastructure - 112,000 SF
Pending Verification
$12,096,000 CJ est. value
Jonesboro, AR 72401

Push Plastic Addition
Addition, Infrastructure - 10,000 SF
Conception
$5,400,000 CJ est. value
Springdale, AR 72764

Elder's Addition
Addition, Demolition, Infrastructure - 23,000 SF
Pending Verification
$2,484,000 CJ est. value
North Little Rock, AR 72113

Hudson Road Light Industrial Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Rogers, AR 72756

Albemarle Corporation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$540,000,000 CJ est. value
Magnolia, AR 71753

Last Updated 09/19/2023 10:36 AM
Project Title

Hostess Brands Inc. / Arkadelphia

Physical Address View project details and contacts
City, State (County) Arkadelphia, AR 71923   (Clark County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $140,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 2023, the project is underway.

Details

330,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents