Similar Projects
Last Updated | 10/12/2022 10:02 AM |
Project Title | Controls For Vaughan Warehouse UKHC |
Physical Address | View project details and contacts |
City, State (County) | Lexington, KY 40504 (Fayette County) |
Category(s) | Heavy and Highway, Industrial/Manufacturing |
Sub-Category(s) | Industrial Warehouse, Site Development |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $95,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of October 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established. This RFP is for the Instrumentation and Controls scope of work related to the Fit-Up & Other Improvements for UKHC at Vaughan. The successful vendor's bid and work will be incorporated into the current contract, with Rising Sun as the general contractor. Refer to the current drawings, specifications, addenda, and contract changes for specific details. Vendors shall also obtain shop drawings from construction project and coordinate with equipment providers. Any controls related work not specifically shown to be provided by equipment providers shall be included under the control vendor's scope. The overall scope is as follows: Contractor shall provide and furnish all hardware required for a fully functional control system per UK Standards and the project Drawings and Specifications. The equipment in the Fit-Up includes package gas/electric rooftop equipment, utility monitoring, ventilation & exhaust fans, HVLS fans, and emergency generator Deadline for Written Questions 3 p.m. Lexington, KY, Time on 08/30/2022 The time for Substantial Completion as further defined in Article 1 of the General Conditions shall be thirty (30) consecutive calendar days from the date of commencement as specified in the Work Order letter, and Final Completion shall be thirty (30) days thereafter |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |