Similar Projects
Ingersoll Rand Compressed Air System Purchase and Install
Bidding

DFCM Construction - Pre Qualified Mechanical - DOH USL Mod 1 RCX/HVAC Repairs
Bidding
$175,000 est. value
West Valley City, UT 84119

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

HVAC Maintenance Services
Post-Bid
Salt Lake City, UT 84119

Airmed Hanger Modifications - Evaporator Cooler and Electrical
Results
Less than $97,000 est. value
Salt Lake City, UT 84112

Commercial HVAC and Building Controls
Term Contract
Results
Salt Lake City, UT 84114

SD 100 HVAC Inverter Replacement
Bidding
Salt Lake City, UT

Wall Mounted HVAC for Portable Classrooms
Term Contract
Post-Bid
Salt Lake City, UT 84070

Annual Contract for Air Handling Equipment Repairs(HVAC)
Term Contract
Results
Salt Lake City, UT 84115

York OEM HVAC Parts and Equipment
Term Contract
Post-Bid
Salt Lake City, UT 84190

Chiller Replacement
Results
West Jordan, UT 84081

Salt Lake County Automatic Build DDC and HVAC Controls
Term Contract
Post-Bid
Salt Lake City, UT 84190

Procure and Install a Source Capture Exhaust System(S)
Results
Sandy, UT 84070

Commercial HVAC and Building Controls Pt.2
Term Contract
Post-Bid
Salt Lake City, UT 84114

Widtsoe DX Condenser and Air-Handler Replacement
Results
$400,000 est. value
Salt Lake City, UT 84112

Last Updated 04/29/2020 06:16 PM
Project Title

Multizone Unit Replacement Phase I

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84088   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. The installation covers the furnishing and installing coils, piping systems, and all necessary trim and specialties, etc., as specified and shown on drawings or as required to provide the complete heating and air conditioning systems shown on the drawings and specified herein. 2. A complete and ample system of heating water and chilled water piping shall be installed as shown on the plans. 3. Piping shall be properly graded and supported to prevent water and air pockets from forming, and to insure noiseless circulation throughout the system. 4. Branches leading from the mains shall be taken off from the top or sides of the mains at 90 deg., except where otherwise directed. These branches shall be arranged with swing connections to accommodate expansion and contraction. 5. All mains reducing in size shall be reduced with eccentric reducing fittings, with top of pipe level for water. 6. Run all piping as high as possible. 7. All heating water and chilled water piping above 2” shall be welded.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents