Similar Projects
Boiler Replacement
Alteration
Bidding
$1,200,000 to $1,400,000 est. value
Faribault, MN

Hot Water Dual Boiler Heating System at the Como Park Hoof Stock Barn
Alteration
Bidding
Saint Paul, MN 55103

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

Steam Boiler Replacement at MCF Red Wing
Results
Less than $1,963,759 est. value
Red Wing, MN 55066

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Boiler Maintenance Services
Term Contract
Bidding
MN

Chiller Maintenance
Post-Bid
Minneapolis, MN

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

Metro and Seneca Incinerator Refractory Repair
Term Contract, Alteration
Bidding
Eagan, Saint Paul, Shakopee, MN 55106

Boiler Services
Term Contract
Post-Bid
Moorhead, MN

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

Boiler and Chiller Replacement
Post-Bid
Woodbury, MN 55125

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Furnace Upgrades & Air Quality Improvements
Post-Bid
Crookston, MN 56716

Last Updated 10/06/2021 04:12 PM
Project Title

Domestic Hot Water Renovation at St. Peter Regional Treatment Center

Physical Address View project details and contacts
City, State (County) Saint Peter, MN 56082   (Nicollet County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $638,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Remove existing domestic hot water system specified on plans. 2. Install new gas-fired condensing water heaters, storage tank, pumps, expansion tank, and mixing valve. 3. Provide new gas branch line complete with deadlegs, shutoff valves and pressure regulators. 4. Provide new electrical power to water heaters, pumps, and mixing valve. 5. Provide new Tridium BAS and integration with water heaters, pumps, and mixing valves.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents