Similar Projects
Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Construction Management at Risk Services - Tifton Conference Center Parking Improvement
Results
Less than $1,965,000 est. value
Athens, GA 30602

Maple Creek Park Asphalt Drive Parking Lot
Post-Bid
Dacula, GA 30019

Dewar Elementary School Drive Way
Results
Valdosta, GA 31605

Recreational Trail Phase II
Post-Bid
Summerville, GA 30747

Greenville Sidewalk and Street Scape Project
Results
Less than $69,669 est. value
Greenville, GA 30222

Buckhead CID West Village Streetscape Project
Post-Bid
Atlanta, GA 30301

Reported 05/05/2021 12:00 AM
Project Title

Lagrange Thread Phase 7 - Clock Tower Trail

Physical Address View project details and contacts
City, State (County) Lagrange, GA   (Troup County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a side path and greenway trail running through the city easements/right of way. The trail begins at the intersection of Cherry Street and Pierce Street at Southbend Park and terminates east of Leeman Street on the Kex Mill property. The project scope includes approximately 1890 LF of concrete trail. Additional work includes minor demolition and clearing, erosion control and grading.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents