Similar Projects
Waterview Drive Warehouse
New Construction - 80,000 SF
Conception
Shelton, CT

Pepper Street Warehouse
New Construction - 28,814 SF
Conception
Monroe, CT 06468

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Nejame Plaza
New Construction - 7,000 SF
Design
$1,500,000 est. value
Danbury, CT 06810

Darien Railroad Station Improvements
Infrastructure
Bidding
$30,000,000 CJ est. value
Darien, CT 06820

Rehabilitation Project for Bridge - Bonnybrook Road Over Holy Ghost Fathers Brook (Site 1) and Cannon Street Over Betts Pond Brook (Site 2)
Infrastructure
Bidding
$2,000,000 CJ est. value
Norwalk, CT 06851

Fairfield Hall Site Improvements at WCSU's Midtown Campus
Infrastructure
Post-Bid
Danbury, CT 06810

Pre Fab Metal Building at Stamford High School
New Construction - 2,460 SF
Post-Bid
$2,000,000 est. value
Stamford, CT 06906

Cold Storage Barn Repairs
Results
Ridgefield, CT 06877

Greenwich High School Phase II Remedial Action
Results
Greenwich, CT 06830

Summer Street Warehouse
Addition - 4,605 SF
Construction
$1,000,000 est. value
Stamford, CT 06905

Lasership
Renovation - 40,000 SF
Construction
$400,000 est. value
Stamford, CT 06902

Forest Commons Building
Demolition, New Construction, Infrastructure - 47,700 SF
Pending Verification
$59,000,000 CJ est. value
Fairfield, CT 06824

Petremont Lane Apartments
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Shelton, CT 06484

Lordship Boulevard Warehouse
New Construction - 169,622 SF
Conception
Stratford, CT 06615

Last Updated 09/22/2022 04:02 PM
Project Title

Modern Self Storage

Physical Address View project details and contacts
City, State (County) Danbury, CT 06810   (Fairfield County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a self-storage facility. As of September 2022, construction is underway.

Details

3 Stories Above Grade, 64,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents