Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Finished Water 3A (FW3A) Pipeline
Bidding
Clovis, NM

Acequia Madre Pipeline Project
Bidding
San Mateo, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

Walatowa Timber Industries Waterline Construction
Post-Bid
Jemez Pueblo, NM 87024

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Maloney Avenue Waterline Replacement
Bidding
Gallup, NM 87301

P-Tunnel Waterline Replacement
Post-Bid
Albuquerque, NM 87131

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Water System Improvements Phase II
Bidding
Jal, NM 88252

Jacquez Road Line Extension
Post-Bid
La Mesa, NM 88021

Alto 2 Well (H-1979-S7) Improvements
Results
Ruidoso, NM 88345

North Gonzales Waterline Replacement
Bidding
Las Vegas, NM

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Last Updated 11/24/2020 09:46 AM
Project Title

Wastewater Collection Lines

Physical Address View project details and contacts
City, State (County) Socorro, NM 87801   (Socorro County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Socorro, New Mexico and includes the installation of new 8", 10", 12", and 15" SDR35 PVC collection lines, new 4' diameter manholes, connections to existing manholes, connections to existing lift station, new sewer services, new lift station, including electrical, controls, concrete, etc., abandonment of existing lift station and manholes, the rehabilitation of existing 8", 10" and 12" collection lines, reestablishment of sewer services, rehabilitation of existing manholes, pipe bursting of existing 6" and 8" collection lines, pavement and concrete patching and other incidental work identified in a base bid schedule and two additive bid schedules, to complete a project within the available funding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents