Similar Projects
Grit Removal Improvements - Rock Creek Pump Station - 302401 - City of Independence
Renovation
Conception
$977,500 CJ est. value
Independence, MO 64050

Nutrient Removal - Rock Creek Treatment Plant - 302502 - City of Independence
Renovation
Conception
$3,000,000 CJ est. value
Independence, MO 64053

Disinfection Wastewater Treatment Plant - City of Kirksville
Renovation
Design
$1,100,000 CJ est. value
Kirksville, MO 63501

Turkey Creek Wastewater Treatment Facility (WWTF) Equipment Building Addition
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Joplin, MO 64801

Rollingwood Plat No. 1 Wastewater Improvements
Renovation
Bidding
$400,000 CJ est. value
Columbia, MO 65203

Wastewater Treatment Facility Improvements at Jackson County Public Works Vehicle Service Center
New Construction
Post-Bid
Grain Valley, MO

Wastewater System Improvements
Renovation
Post-Bid
$1,600,000 est. value
Greenfield, MO

Wastewater Treatment Facility Improvements
New Construction, Infrastructure
Results
Laredo, MO

Aeration Diffuser Replacement
Renovation
Results
Mexico, MO 65265

Wastewater Treatment Facility Headworks Repairs - 2022
Infrastructure
Construction
$276,467 CJ est. value
Kansas City, MO 64152

2021 Bond - City of Warrenton
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Warrenton, MO 63383

Lemay WWTP Building Renovation
Renovation
Bidding
$200,000 CJ est. value
Saint Louis, MO 63125

WWTP Snail Removal Structure Renovation
Renovation
Post-Bid
$360,000 est. value
Monett, MO

Missouri River WWTF Digester Gas Storage Cover Replacement
Renovation
Results
$1,624,000 est. value
Saint Louis, MO

RFP D/B - Automated Mechanical Debris Removal System
Renovation
Bidding
$160,000 CJ est. value
Columbia, MO 65203

Last Updated 02/02/2023 11:31 AM
Project Title

Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Trenton, MO 64683   (Grundy County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,733,339 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Trenton reserves the right to award the contract to the "lowest and best responsible bidder". The City reserves the right to reject any or all bids. The City further reserves the right to waive any irregularities in any or all bids and reserves the right to determine which is the most responsive, responsible bidder and to reject or approve the bids. Each bid must be accompanied by a bid security of 5% of the total amount of the bid (bid bond, cashier's check, or approved money order payable to the City of Trenton, Missouri). Work under this contract to be fully complete by 365 consecutive calendar days. The wage rates applicable for this project has been predetermined as required by the State of Missouri Prevailing Wage Law and are set forth in the proposal. Checks should be made payable to "ADS". Shipping and Handling costs will be determined at the time of purchase. A set of plans and specifications will be available at Trenton City Hall for reviewing only. The Contractor shall comply with all requirements with regard to immigration and e-verification of citizenship. The Contractor shall also comply with all requirements with regard to OSHA safety training and requirements. Only Missouri laborers and laborers from nonrestrictive states are allowed by law to be employed on Missouri's public works projects when the unemployment rate exceeds 5% for two consecutive months. Bonding and insurance requirements are set forth in the proposal. A mandatory site visit will be required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents