Similar Projects
Security Camera, Door Access Control & Intrusion Alarm System Replacement at Kenneth R. Olson Middle School And Tabernacle Elementary School - Rebid
Renovation
Bidding
$500,000 CJ est. value
Tabernacle, NJ 08088

Seneca High School Auto Shop Renovation/Conversion
Renovation
Post-Bid
$744,000 CJ est. value
Tabernacle, NJ 08088

Pemberton Township High School Auditorium Renovations
Renovation
Post-Bid
$2,000,000 CJ est. value
Pemberton, NJ 08068

Facility Improvements - Hainesport Township School
Renovation
Results
$359,000 est. value
Hainesport, NJ

Prefabricated Storage Units at the Northern Burlington County High School
New Construction, Infrastructure
Results
$436,000 CJ est. value
Mansfield, NJ 08022

Westampton Middle School - 2022 Bond - Westampton School District
Addition, Renovation, Infrastructure
Pending Verification
$10,706,194 CJ est. value
Mount Holly, NJ 08060

Delran Middle School - 2022 Bond - Delran Township School District
Renovation, Infrastructure
Pending Verification
$983,580 CJ est. value
Delran, NJ 08075

RFP Construction Manager Service - Construction of Various Capital Projects
Renovation
Post-Bid
$400,000 CJ est. value
Riverside, NJ 08075

Auditorium Stage Rigging Repairs - F.W. Holbein School
Renovation
Results
$124,392 CJ est. value
Mount Holly, NJ 08060

Delran High School - 2022 Bond - Delran Township School District
Renovation, Infrastructure
Pending Verification
$780,000 CJ est. value
Delran, NJ 08075

Helen Fort and Marcus Newcomb Middle Schools Boiler Replacements
Renovation
Post-Bid
$300,000 CJ est. value
Pemberton, NJ 08068

Cafeteria Renovations at Northern Burlington County Regional High School
Renovation
Results
$1,197,000 CJ est. value
Mansfield, NJ 08022

Delran Intermediate School - 2022 Bond - Delran Township School District
Renovation, Infrastructure
Pending Verification
$670,873 CJ est. value
Delran, NJ 08075

Maintenance Building at Burlington City High School
New Construction, Infrastructure
Post-Bid
$375,000 CJ est. value
Burlington Township, NJ 08016

Seneca High School Irrigation Well Replacement
Renovation
Results
$70,725 CJ est. value
Tabernacle, NJ 08088

Last Updated 10/17/2023 10:18 AM
Project Title

ESCO Energy Savings Improvements for: City of Burlington Public Schools

Physical Address View project details and contacts
City, State (County) Burlington Township, NJ 08016   (Burlington County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $2,170,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

LAN Project 20281.09 Sealed bids are sought and requested by Honeywell Building Technologies (hereinafter called "ESCO"), for two energy saving improvement contracts for the City of Burlington School District (hereinafter called "CBSD") in Burlington, NJ. Bidders shall be advised that the scope of work in the specification packages is for turn-key construction services that include audit and design work as well as construction. Commencing on Friday, September 22, 2023, bid documents for this project will be available for review between the hours of 9:00 a.m. & 4:00 p.m. on business days at the offices of LAN Associates, Engineering, Planning, Architecture, Surveying, Inc. (LAN), 445 Godwin Avenue, Suite 9, Midland Park, NJ 07432. Bid documents shall be available via an email link. All technical questions, comments, and inquiries should be directed to LAN (Attention: Mr. Alex Li, PE) at Telephone #201-447-6400 or Email: alex.li@lanassociates.com. Further information may be obtained by contacting City of Burlington School District at Telephone #609-387-5876. Bids, utilizing the bid forms as prepared by the Engineer, may be submitted in person, by mail or delivery service prior to that time. Any bid submitted by mail or delivery service is done so at the sole risk of the bidder. No Bids will be received by facsimile or electronic transmission. It is expressly understood that the bidder is responsible for getting the bid proposals to the CBSD Board Office prior to the time and date set for the bid opening. Any bid received after the closing time will be returned unopened. In order to be considered, bids must be sealed, and outer envelope clearly marked, specifying the appropriate Prime Bid ECM: City of Burlington School District ESCO Energy Savings Improvements: ECM-3: Cogeneration (CHP). While not mandatory, attendance is highly recommended. All attendees must bring a valid photo I.D. and sign-in at the school's main office. The deadline for submitting questions to the Engineer is Thursday, September 29, 2023, at 5:00 PM. All technical questions, comments, and inquiries should be directed to LAN (Attention: Mr. Alex Li, PE) at Telephone #201-447-6400 or Email: alex.li@lanassociates.com. Addendum shall be released to all registered Bidders and may be obtained directly from the office of the Engineer on Thursday, October 5, 2023. Bids will be received from a Prime Contractor for one price for each ECM, all trades, all-inclusive. Bidders must be pre-qualified by the New Jersey Department of Treasury, Division of Property Management and Construction pursuant to N.J.S.A. 18A:18A-27, et. seq. Pursuant to N.J.S.A. 18A:18A-26, in order to be eligible to submit a Bid for the Project, the Bidder shall be classified by the New Jersey Department of Treasury, Division of Property Management and Construction in the following disciplines: ECM-3: (C032) - HVACR or (C030) - PLUMBING No modifications to the enclosed Instructions to Bidders, General Conditions, Supplemental Conditions or Specification will be permitted prior to bid acceptance. Bids that propose modifications or substitutions to the requirements set forth in the Project Manual shall result in rejection of the bid as being nonresponsive. Bidders shall submit a N.J. Business Registration, Certificate of Prequalification/Classification from the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) for the contractor and all major subcontractors and an Affidavit as to the Total Amount of Uncompleted Contracts for the contractor and all major subcontractors. Bidders are required to comply with the Public Works Contractor Registration Act, Chapter 238, Public Laws (N.J.S.A. 4:11-56.50 et. seq.), and be required to submit with the bid, evidence of contractor and major subcontractor registration with the New Jersey Department of Labor, Division of Wage and Hour Compliance. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31, et seq., N.J.A.C. 6:4-1.6, and N.J.A.C. 17:27. Bidding shall be in conformity with the applicable requirements of the "Public School Contracts Law," N.J.S.A. 18A:18-1 et seq. and N.J.S.A. 18A:7G-1 et seq., the "Educational Facilities and Construction Financing" law. No bid may be withdrawn for a period of sixty (60) days after the opening date. The Board reserves the right to reject any and all bids and / or to waive any informality in the bidding, as permitted by law, if it is in the interest of the Board to do so. The Contract will be awarded to the lowest responsible bidder as defined in N.J.S.A 18A:18A-2. Pursuant to "The Public Works Contractor Registration Act," N.J.S.A. 34:11-56.50 et seq., Bidders and their subcontractors are required to be registered with the New Jersey Department of Labor and to possess a current Certification from said Department indicating compliance with the Act at the time of bidding. Bids must be accompanied by bid security in the form of (1) a bid bond or certified or cashier's check payable to the ESCO equal to 10% of the amount of the bid, but in no case to exceed $20,000.00 as per N.J.S.A. 18A: 18A-24 and (2) Certificate of Consent of Surety as per N.J.S.A. 18A:18A-25. The esco and city of burlington school district reserve the right to reject any and all bids, to waive any immaterial defects in any bid, or to award separate contracts or a lump sum contract (as applicable), in such a manner as shall be, in the judgement of the school district, deemed in its best interest, all in conformity with the law.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents