Similar Projects
Intersection Modification, ADA Improvement and Drainage Repair
Infrastructure
Conception
$1,300,000 est. value
Minneapolis, MN 55403

Resurfacing, Drainage and Auxiliary Lane Construction - TH 35W
Infrastructure
Conception
$13,000,000 est. value
Bloomington, MN 55438

Como 154 Recycling - Retaining Wall and Sidewalk Replacement
Infrastructure
Design
$400,000 est. value
Minneapolis, MN 55414

OlyHi (Wooddale Station)
New Construction, Infrastructure
Design
Less than $83,500,000 est. value
Edina, MN 55416

2022 CSAH 19 Watermain
Infrastructure
Bidding
$225,000 CJ est. value
Orono, MN 55364

Bryn Mawr Meadows Park Site Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Minneapolis, MN 55405

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

Energy Hills, Woodland Ponds, Wintergreen Area Street Reconstruction
Post-Bid
Maple Grove, MN

Directional Boring
New Construction
Results
Minneapolis, MN 55401

Fernbrook Lane/Territorial Road
Results
Maple Grove, MN 55311

Pentagon Park Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$85,000,000 CJ est. value
Edina, MN 55435

Pentagon Park Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$85,000,000 CJ est. value
Edina, MN 55435

Upper Harbor Redevelopment - Future Phases
New Construction, Infrastructure
Design
$150,000,000 CJ est. value
Minneapolis, MN 55415

RFP Engineering - F Line Traffic Analysis and Concept Development
Infrastructure
Bidding
$300,000 CJ est. value
Minneapolis, MN 55415

Ryan Lake Industrial Park Area, Northwest Area & Lyndale Area Mill and Overlay Improvement
Post-Bid
$2,500,000 to $3,000,000 est. value
Brooklyn Center, MN

Last Updated 07/26/2022 04:35 PM
Project Title

North Shore Drive Ravine Stabilization

Physical Address View project details and contacts
City, State (County) Orono, MN 55356   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $103,705 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

9 EACH CLEAR & GRUB TREE 50 CY COMMON EXCAVATION 14 LF 24-INCH RCP 520 SF GABION WALL 200 SY TURF RESTORATION.

Details

Division 31 - Earthwork, Clearing and Grubbing, Selective Tree and Shrub Removal and Trimming, Excavation and Fill, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Retaining Walls, Gabion Retaining Walls, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents