Similar Projects
Mount Vernon Road South East 14th to 20th
Conception
$5,400,000 est. value
Cedar Rapids, IA 52407

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 est. value
Waukee, IA

Northglen Trail Replacement - City of Johnston -
Alteration
Design
$400,000 est. value
Johnston, IA 50131

Benton Street Rehabilitation
Infrastructure
Bidding
$4,200,000 est. value
Iowa City, IA 52246

ITS Infrastructure
Infrastructure
Bidding
$125,000 to $250,000 est. value
Hiawatha, IA 52233

PCC Pavement Patching
Infrastructure
Post-Bid
IA

PCC Patching
Infrastructure
Post-Bid
IA

Rotary Reserve Access Lane and Parking Lot Resurfacing
Infrastructure
Results
Waterloo, IA

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 est. value
Des Moines, IA 50982

PCC Pavement - Replace
Infrastructure
Bidding
$3,500,000 to $4,000,000 est. value
Estherville, IA 51334

Various Locations - HMA Resurfacing with Milling
Infrastructure
Post-Bid
IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Meredith Drive Preservation 104th Street to 121st Street - ST22-04 - City of Urbandale
Infrastructure
Conception
$1,200,000 est. value
Urbandale, IA 50323

Last Updated 06/20/2022 01:15 AM
Project Title

Road Maintenance - Shimek State Forest

Physical Address View project details and contacts
City, State (County) West Point, IA   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $96,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the removal of an existing, sectional concrete beam, low water crossing, the installation of articulated concrete block matting, removal and installation of an RCP culvert, placement of macadam/erosion stone/rip rap and ditch cleaning.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents