Similar Projects
Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

Fabrication of Coffer Box for Mcclellan-Kerr Arkansas River Navigation
New Construction
Design
$1,000,000 to $5,000,000 est. value
Kerr, AR - Littleton, CO - Broken Arrow, Chouteau, Webbers Falls, OK 74014

CHIC Gravel and Dam Maintenance
Infrastructure
Bidding
$100,000 to $250,000 est. value
Sulphur, OK 73086

Scott Parker Wentz Tunnel Rehabilitation
Alteration
Post-Bid
Stillwater, OK

Webbers Falls Stilling Basin Repairs
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Fort Sill, OK

Summit Lakes Dam Repair CMAR Services
Renovation
Results
Norman, OK 73026

Sluice Gate & Butterfly Valve Repair at Oologah Lake, Ok
Term Contract
Results
$500,000 to $1,000,000 est. value
Oologah, OK

Navigation & Hydraulic Steel Structures Repair
Renovation
Post-Bid

Repairs to W.D. Mayo Lock and Dam 14, and Newt Graham Lock and Dam 18 -
Renovation
Results
$5,000,000 to $10,000,000 est. value
Claremore, OK 74017

Misty Lake Dam Rehabilitation
Renovation
Post-Bid
Norman, OK

Emergency Watershed Protection (EWP) Streambank Stabilization
Renovation
Results
Perkins, OK

ARS Woodward Embankment Rehabilitation
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Woodward, OK

Spavinaw Dam South Abutment Repair
Infrastructure
Results
$300,000 est. value
Tulsa, OK

R.S. Kerr Dam Tainter Gates Rehabilitation and Repairs
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Sallisaw, OK

Hominy Municipal Lake Siphon
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Hominy, OK

Reported 06/14/2022 12:00 AM
Project Title

R.S. Kerr Dam Tainter Gates Rehabilitation and Repairs

Physical Address View project details and contacts
City, State (County) Sallisaw, OK   (Sequoyah County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope: The scope of the project includes rehabilitation, repair, partial replacement, and painting of specified tainter gates, and incidental related work. The work required is summarized as follows: (1) Brush-off blast entire gates, inspection of damaged gate members, and provide gate inspection report; (2) Removal and replacement of diagonal members; (3) Removal and replacement of ribs; (4) Partial removal and replacement of skin plate; (5) Surface repair of primary members (girders); (6) Removal and replacement of miscellaneous stiffener plates; (7) Addition / modification of drain holes; (8) Blasting and painting of entire gates; (9) Removal and reattachment of existing wire rope assemblies and associated fittings and proper re-tensioning of wire ropes within specified tolerances; (10) Rehabilitation of hitch blocks with removal and replacement of hardware; (11) Removal and replacement of side seals assemblies and adjustment within specified tolerances; (12) Removal and replacement of trunnion hydraulic lubrication tubing and fittings; and (13) Providence of spare components as specified.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents