Similar Projects
Reported | 06/14/2022 12:00 AM |
Project Title | R.S. Kerr Dam Tainter Gates Rehabilitation and Repairs |
Physical Address | View project details and contacts |
City, State (County) | Sallisaw, OK (Sequoyah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Scope: The scope of the project includes rehabilitation, repair, partial replacement, and painting of specified tainter gates, and incidental related work. The work required is summarized as follows: (1) Brush-off blast entire gates, inspection of damaged gate members, and provide gate inspection report; (2) Removal and replacement of diagonal members; (3) Removal and replacement of ribs; (4) Partial removal and replacement of skin plate; (5) Surface repair of primary members (girders); (6) Removal and replacement of miscellaneous stiffener plates; (7) Addition / modification of drain holes; (8) Blasting and painting of entire gates; (9) Removal and reattachment of existing wire rope assemblies and associated fittings and proper re-tensioning of wire ropes within specified tolerances; (10) Rehabilitation of hitch blocks with removal and replacement of hardware; (11) Removal and replacement of side seals assemblies and adjustment within specified tolerances; (12) Removal and replacement of trunnion hydraulic lubrication tubing and fittings; and (13) Providence of spare components as specified. |
||||||
Details | Dam/Tunnel, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |