Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

3rd Floor Judges Chambers HVAC Project
Alteration
Results
$90,000 to $110,000 est. value
Bellingham, WA 98225

Longfellow Elementary HVAC Replacement
Alteration
Post-Bid
Pasco, WA

65th Campus HVAC Makeup Air Unit
Alteration
Results
$85,000 to $95,000 est. value
Vancouver, WA 98661

South Bend Junior and Senior High School HVAC Upgrades
Alteration
Post-Bid
South Bend, WA 98586

Reported 05/03/2022 10:38 AM
Project Title

Architecture Hall HVAC Improvements

Physical Address View project details and contacts
City, State (County) Seattle, WA 98195   (King County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $885,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform interior upgrades to existing outside air ventilation at (8) studio locations on the ground floor and second level of the Architecture Hall building. Existing rectangular vents above existing windows within the studio spaces will be utilized for air intake and exhaust. The project will upgrade the ventilation to current codes using energy recovery ventilators (ERV). Each studio will be provided with an ERV and each ERV will be tied into the existing building environmental controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents