Similar Projects
Concrete Slabs and Other Related Materials
Post-Bid
Saint Louis, MO

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

2021 Concrete Slab Replacement
Results
Crestwood, MO 63126

Concrete Repair and Restoration
Alteration
Post-Bid
Saint Ann, MO 63074

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Holloway Road Improvements
Results
Ballwin, MO 63011

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Last Updated 08/09/2022 12:07 PM
Project Title

Concrete and Brick Removal / Replacement and Complete Sidewalk Installation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63103   (Saint Louis City County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,093,985 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 09, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** It includes all demolition work, all items pertaining to construction of Portland Cement Concrete curbs, gutters, sidewalks, alley aprons, roadway pavement, base course, steps and driveways The 50-50-sidewalk program is essentially a residential sidewalk replacement program that will undertake to repair hundreds of sidewalks throughout the City. all work pertaining to adjustment, replacement, and/or relocation of water valves, water stop boxes, water meters, service lines, sewer vents, and roof drain connections 1 Asphalt Patch 2 PCC Sidewalk 3 Exposed Aggregate Sidewalk 4 Red Tint Sidewalk 5 Removal Sidwewalk/Earth Fill 6 PCC Driveway Apron 7 PCC Vertical Curb 8 Replace PCC Steps 9 Concrete Sawcut 10 Base Course Concrete 11 Adjust Granite Curb 12 Replace Water Stop Box 13 Replace Sewer Vent 14 Adjust Inlet Top 15 Replace Inlet Top Period of Performance: 280 Calendar Days Liquidated Damages Per Day: $250.00 per day Bid Deposit: $17,404.00 M/WBE Goals: 21% African American, 2% Hispanic American, 0.5% Asian American, 0.5% Native American, and 11% Women ESTIMATED COST: $687,130.00

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents