Similar Projects
Last Updated | 04/17/2019 10:22 AM |
Project Title | Lake Moxie Road in the Forks Plantation and Moxie Gore Township |
Physical Address | View project details and contacts |
City, State (County) | West Forks, ME (Somerset County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The entire length will be approximately 5.5 miles. 1. Beginning at the intersection of Rt 201 and the Lake Moxie Rd. provide and properly place 9.5 mm hot mix asphalt shim material 16,368 feet in length, 20 feet in width an average of V* of an inch in depth to restore the proper 2% cross slope and crown of the existing surface. (Approximately 1,490 tons) 2. Beginning at the intersection of Rt. 201 and the Lake Moxie Road, provide and properly place 12.5 mm hot mix asphalt 29,040 feet in length, 20 feet in width and 1)4 inches in depth at a 2% cross slope. (Approximately 5,314 tons) 3. All hot mix asphalt placement shall follow the MOOT standard specification (November 2014 edition. Section 401 Hot Mix Pavement) The contractor shall provide the mix design for the shim and surface material with their bid. The contractor shall also provide truck weight slips to Somerset County and The Forks Plantation. 4. All shoulders shall be brought up to the pavement approximately 3 feet in width at a VA to 1 slope. (Approximately 1050 cu yds.) 5. All gravel driveways and intersections shall be brought up to the pavement elevation for a smooth transition with the road surface. 6. All paved driveways and intersections shall be brought up to the pavement elevation with 12.5 mm surface hot mix asphalt creating a smooth transition with the road surface. 7. Any additional (incidental) work approved by The Forks Pit. or Somerset County shall be done on a time and material basis. 8. The contractor shall Dig-Safe the project, clean and slope all ditches so as to provide proper drainage off, out of and away from the road. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |