Similar Projects
Last Updated | 03/30/2023 06:01 AM |
Project Title | Traffic Control Devices |
Physical Address | View project details and contacts |
City, State (County) | Rockledge, FL 32955 (Brevard County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $57,531 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Brevard, Citrus, Clay, Duval, Hernando, Hillsborough, Lake, Orange, Osceola, Pasco, Polk, Seminole, Sumter, Turnpike Road Name: Traffic Control Devices - Zones 3, 4 & 5 Limits: Midpoint Project(s): 43791417203(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 14 The work specified in this contract consists of providing all labor, materials, equipment, and incidentals necessary to provide traffic control devices at various locations on the Florida's Turnpike (SR 91) MP 200 to 309, Beachline Expressway (SR 528), East-West Expressway (SR 408), Southern Connector Extension (SR 417), Seminole Expressway (SR 417), Suncoast Parkway (SR 589), Veterans Expressway (SR 589), Polk Parkway (SR 570), Western Beltway (SR 429), First Coast Expressway (SR 23), Beachline Expressway East (SR 528) and Challenger Memorial Parkway (SR 407). No Pre-Bid Conference. Contractor must be prequalified. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FLDOT - Call Order : 003 Traffic Control Devices |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |