Similar Projects
Orem YSA Pavilion
New Construction
Bidding by Invitation
Orem, UT 84957

Playground Equipment for Windsor Park
Post-Bid
Orem, UT

Lehi City Park Playgrounds
Post-Bid
Lehi, UT 84043

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

American Fork Art Dye Sports Park Phase 1 and 2
Results
Less than $711,720 est. value
American Fork, UT

Mountain Ridge Tennis Courts Improvements
Construction
Highland, UT 84003

Spanish Fork City`s All Ability Park
Post-Bid
Spanish Fork, UT 84660

Harvey Park Project
Results
Cedar Hills, UT

Playground Equipment Installation-North Park Unlimited Play Center
Post-Bid
Provo, UT 84606

2019 Bonneville Park, Geneva Park, and Cascade Park Sports Courts Project
Results
Orem, UT 84057

Pony Express Parkway Median Improvements
Post-Bid
Eagle Mountain, UT 84005

Legacy Farms Park
Results
Spanish Fork, UT 84660

Grass Soccer Field - Vineyard
Term Contract
Results
Vineyard, UT 84059

Highland City Parks Maintenance Building
Results
$800,000 to $900,000 est. value
Highland, UT 84003

Outside Tennis Court Improvements
Term Contract
Results
Spanish Fork, UT 84660

Last Updated 11/28/2018 04:16 PM
Project Title

Memorial Park Pickleball Design/Build Project

Physical Address View project details and contacts
City, State (County) Payson, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method
Project Status Construction Commenced October 2018
Bids Due View project details and contacts
Estimated Value $415,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Payson City Pickleball Design/Build Project is for the design and construction of a new addition to the Memorial Park. The existing park was dedicated on May 1, 1920 and is our Main City Park hosting many City Celebrations and events as well as a traditional park for everyday use, and the existing tennis courts are approximately 10,000 square feet in size. The qualified firm will need to incorporate the existing parking lot and walkways into the design and construction of the new pickleball and basketball courts over the existing tennis court area. Priorities for the project include: keeping the existing retaining wall, enhancing the open water way, installing six new post tension lighted pickleball courts and basketball courts, walks and new parking lot with curb and gutter. The work provided by the qualified firm will need to include: conceptual design, schematic design, and a detail design including construction documents. The qualified firm will prepare accurate construction cost estimates, project scheduling, preparation of construction documents and specifications, and construction of project elements.
Details
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents