Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Results
$450,000 to $500,000 est. value
Seattle, WA 98122

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

San Souci Road Elevation Design
Infrastructure
Design
WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

Last Updated 03/13/2023 07:32 PM
Project Title

Lea Hill Safe Routes to Schools - gcbd16 - City of Auburn

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will design and construct non-motorized improvements along SE 304th St from Hazelwood Elementary School extending east to 124th Ave SE and continuing south along 124th Ave SE to Lea Hill Elementary School. The project will complete multiple gaps in the existing non-motorized network. The elements of work include construction of approximately 2,400 linear feet of sidewalk to match adjacent widths. The project will also construct curb and gutter, ADA compliant curb ramps, driveways aprons and retaining walls associated with the new sidewalks. Utility poles will need to be relocated to accommodate the proposed sidewalk alignment in some locations. Where sidewalks are installed the bike network will be extended in most locations along the project to include the connection to and from the existing bicycle improvements constructed as part of the SE 304th St/124th Ave SE roundabout. Additional lighting is proposed for pedestrian safety and will be incorporated onto existing/relocated utility poles. Ancillary work, including but not limited to, property restoration, grading, storm upgrades, school zone beacon relocation, channelization, fencing, landscaping and mailbox relocation will be addressed with the project. The project is included in the City of Auburn's FY 2020-2025 Capital Improvement Program (CIP). As of March 13, 2023, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents