Similar Projects
Pressure Cleaning-Painting and Repair of Walls
Bidding
North Lauderdale, FL 33068

Exterior Painting Administrative Buildings
Post-Bid
Pompano Beach, FL 33069

Exterior Painting of the Senior Center Complex
Post-Bid
Pembroke Pines, FL 33025

A1A Bridge Painting Improvements Project
Results
Hallandale, FL

Bridge Painting
Results
Less than $1,565,385 est. value
FL

Spray Paint
Post-Bid
FL

Specialty Coating Services
Term Contract
Results
Less than $400,000 est. value
FL

Painting Application for New First Aid Stations and Lifeguard Towers
Post-Bid
Less than $75,000 est. value
Hollywood, FL

Bridge Painting
Results
Less than $2,918,598 est. value
FL

Fuel Tank Painting
Post-Bid
Coral Springs, FL

Waterford Park Racquetball Court Wall Painting
Results
Davie, FL

Exterior Painting of Coral Springs Gymnasium
Post-Bid
Coral Springs, FL 33065

Painting of Selected District Facilities
Term Contract
Results
Fort Lauderdale, FL 33301

Exterior Waterproofing and Painting
Post-Bid
Davie, FL 33314

Fire Hydrant Sandblasting, Priming, and Painting
Term Contract
Results
Plantation, FL

Reported 05/03/2019 12:00 AM
Project Title

Painting of Lift Station 7 and Booster Pump Station

Physical Address View project details and contacts
City, State (County) Miramar, FL   (Broward County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Paint two (2) Lift Station buildings (Lift Station #7 and the Booster Pump Station). 1. Sanitizing all mildewed surfaces 2. Power washing all exterior surfaces to be painted as well as all tiled roofs and all concrete areas. 3. Preparing and sealing all exposed and chalky stucco surfaces. 4. Spot priming any bare metal and/or bare wood surfaces. 5. Repairing and waterproofing all cracks (look for water intrusion areas) 6. Replacing all damaged caulking (look for water intrusion areas) 7. Caulking all sides of bands where water intrusion may occur 8. Preparing and repainting all exterior stucco surfaces to include all vertical and shear walls, eyebrows, soffits, fascia, decorative elements, ceilings, banding and any other previously painted stucco surfaces. Note: All paint will be sprayed and back rolled. 9. Preparing and repainting all doors and frames (exterior side only, where previous painting is present only). 10. Replacing all damaged fascia; (must also be caulked, painted, and priced per linear foot).
Details
Division 09 - Finishes, Painting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents