Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

SR 145 - Slide Correction
Infrastructure
Conception
$327,000 CJ est. value
Birdseye, IN 47513

Beacon Health Clinic
New Construction - 33,000 SF
Design
$11,000,000 est. value
Goshen, IN 46526

Beechwood Courts
Demolition, New Construction, Infrastructure
Design
$25,000,000 CJ est. value
New Albany, IN 47150

New Municipal Maintenance Building
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Berne, IN 46711

Well Now Urgent Care / Clarksville - Rebid
Demolition, Build-out - 3,531 SF
Bidding
$850,000 CJ est. value
Jeffersonville, IN 47129

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Building Demolition and Site Clearance at Beechwood Court
Demolition, Infrastructure
Post-Bid
$26,150,000 est. value
New Albany, IN 47150

Headwaters Lot Excavation and Remediation
Infrastructure
Results
Fort Wayne, IN 46802

County Road 4 Extension Between County Roads 17 and 19: Clearing and Grading
Infrastructure
Results
Goshen, IN

US Renal
Renovation - 9,250 SF
Construction
Muncie, IN 47304

Scooter's Coffee / Decatur
New Construction, Infrastructure - 664 SF
Construction
$200,000 CJ est. value
Decatur, IN 46733

2022 Bond Lebanon Community School Corporation
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Lebanon, IN 46052

Urgent Care
New Construction, Demolition - 4,000 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Goshen, IN 46528

Brickyard Solar
New Construction, Infrastructure
Conception
$215,600,000 CJ est. value
Zionsville, IN 46077

Last Updated 02/13/2023 03:05 PM
Project Title

Fast Pace Health Urgent Care / Shelbyville

Physical Address View project details and contacts
City, State (County) Shelbyville, IN 46176   (Shelby County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Occupancy, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an urgent care facility. As of February 13 2023 this project is complete. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3,726 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents