Similar Projects
Medium Mill and Overlay - TH 65
Infrastructure
Conception
$3,100,000 CJ est. value
McGregor, MN 55760

Medium Mill and Overlay - TH 65
Infrastructure
Conception
$3,100,000 CJ est. value
McGregor, MN 55760

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

East Lake Ceremonial Parking Lot Expansion
Infrastructure
Bidding
$600,000 CJ est. value
McGregor, MN 55760

DNR R2 McGrath Power Shovel Excavation
Infrastructure
Post-Bid
McGrath, MN 56350

Aitkin Area Forest Road Grading
Infrastructure
Post-Bid
MN

Grading, Bituminous Surfacing and Br 01X11
Results
$500,000 est. value
MN

Township Concrete Box Culvert Replacement
Infrastructure
Results
MN

Bit Mill and Overlay, Drainage Repair, ADA Improvements - TH 65
Infrastructure
Conception
$15,000,000 CJ est. value
McGregor, MN 55760

Elliot State Forest Road Resurface
Infrastructure
Post-Bid
Warba, MN 55793

Aggregate Surfacing
Infrastructure
Results
Hill City, MN 55748

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Wetland Restoration - Lorentz Site
Term Contract
Results
MN

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Seal Bituminous Cracks
Infrastructure
Results

Last Updated 02/13/2023 04:02 PM
Project Title

CSAH 11 Bituminous Paving, Aggregate Shouldering, Culvert Replacement, Shoulder Widening

Physical Address View project details and contacts
City, State (County) Hazelton Township, MN 56431   (Aitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,227,401 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CSAH 11 Bituminous Paving, Aggregate Shouldering, Culvert Replacement, Shoulder Widening Construction Start Date:02/20/2023 Construction End Date:11/03/2023

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents