Similar Projects
New City Hall Complex
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Courthouse Expansion
Addition
Conception
$15,000,000 est. value
Panama City, FL

Downtown Largo City Hall
New Construction
Design
$25,000,000 est. value
Largo, FL 33779

Tarpon Springs City Clerks Office Renovation
Renovation - 2,500 SF
Design
$1,000,000 to $2,000,000 est. value
Tarpon Springs, FL 34689

Construction of Public Works Operations Facility
New Construction - 32,000 SF
Bidding
$11,000,000 est. value
Clermont, FL 34711

Nassau County Justice Center Courtroom 3 - Preparation of Design Criteria Package
New Construction
Bidding
Yulee, FL 32097

Miami Dade College Dyer Courthouse Renovation
Renovation
Post-Bid
Miami, FL 33132

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Ft Meyers Courthouse Roofing Building Enclosure Repairs
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Myers, FL 33901

Design Build for the Seminole County Justice Center and Public Safety Administration Building
Results
Less than $65,625,000 est. value
Sanford, FL

Waller Park Renovations ADA Improvements Capitol Building
Renovation
Construction
Tallahassee, FL 32301

New City Hall and Municipal Campus Improvements
- 120,000 SF
Construction
Sunrise, FL

Criminal Justice Center Renovation and Five Points Building System Improvements
Renovation
Conception
Sanford, FL 32773

North Dade Government Center, Landmark Site
- 15,500 SF
Design
$7,500,000 est. value
Miami, FL 33055

Historic Courthouse Elevator Modernization/ADA Compliant Project
Renovation
Bidding
Bradenton, FL 34205

Last Updated 11/08/2021 10:12 AM
Project Title

City Hall 2nd Floor Office Renovation Project

Physical Address View project details and contacts
City, State (County) North Miami Beach, FL 33162   (Miami-Dade County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I - Priority the Awarded Contractor Will Commence to Construct Three offices and One Conference Room (office 120, 121, 122, 123) On the Front Southside of the office Renovations First and Complete As Such. This Will Consist of an Upgrade to the Electrical and HVAC Portion to Those offices and Conference Room As Per Drawings Attached. This Scope Will Include Framing, Electrical, Low Voltage, Drywall, Paint, Suspended Ceilings, Doors, Flooring, Lighting, and Fire Devices. a Temporary Certificate of Occupancy (Tco) Will Be Approved By the Building Department.

Details

Capitol/Court House/City Hall, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents