Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Building Exterior Renovation Project
Construction
Celina, OH

CDC/NIOSH Architect Engineer Services
Term Contract
Design

Celina CSD - Mercer County - CFAP
New Construction, Renovation, Infrastructure - 376,153 SF
Bidding
$106,632,000 est. value
Celina, OH

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Construction Management Services for the United States Army Corps of Engineers Great Lakes and Ohio River Division
Term Contract
Design

Architect-Engineer Environmental Services
Renovation, Term Contract
Bidding
$100,000 to $1,000,000 est. value

Last Updated 01/25/2022 04:07 PM
Project Title

Celina CSD - Mercer County - CFAP - OFCC 11.18.21 - CB 12.13.21

Physical Address View project details and contacts
City, State (County) Celina, OH 45822   (Mercer County)
Category(s) Education, Professional Services
Sub-Category(s) Elementary School, Engineering, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $106,632,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Build New Middle/High School to house 1,428 students, grades 7-12 Career Technical Students. The building is to be approximately 199,982 square feet with a total co funded cost of 60,892,574 which includes 60,036,217 non-allowance cost, $856,356.78 allowance cost. • Renovate Celina Intermediate Middle to house 1,589 students, grades PK-6 students. The renovation and addition are to be approximately 176,171 square foot facility at a total project cost of $43,234,095.60 that includes $41,444,553.85 non-allowance cost, $1,789,541.75 allowance cost.. • There are five Abate/Demolition projects: o Demolish Celina Middle at a cost of $442,471.92, 73,569 existing square feet. o Demolish Celina High School at a cost of 1,123,805, 157,569 existing square feet. o Demolish East Elementary at a cost of $330,419.49, 64,961 existing square feet. o Demolish West Elementary at a cost of $226,899.09, 40,472 existing square feet. o Demolish Educational Center at a cost of 382,913, 74,697 existing square feet. • Locally funded initiatives: The district currently has approximately $11,400,000 set aside for thefor the following considerations: o Reprogram the current CIS building for adequate cafeteria space. o Fixed seat Auditorium (seating 600 persons) at 7-12 building. o Parent/staff parking at PK-6 building. o Make the Bus pick-up/drop-off area separate from the Parent pick-up/drop-off area for the PK-6 building. o Handicapped Accessible playground at PK-6 building. o Additional square footage at PK-6 building. o Additional square footage at 7-12 building. • The district has potential additional Scope they wish to fund: o Currently the district has approximately 20,000,000 in additional scope they wish to fund. This scope includes but not limited to a bus garage, a Science and Media Center and possibly head start classrooms Estimated Budget $106,632,000

Details

,, 787,421 SF - 1 Middle/Senior High School, Approximately 199,982 SF New Construction, 1 Elementary School, Approximately 176,171 SF Renovation, 1 Middle/Senior High School, Approximately 73,569 SF Demolition, 1 Middle/Senior High School, Approximately 157,569 SF Demolition, 1 Elementary School, Approximately 64,961 SF Demolition, 1 Elementary School, Approximately 40,472 SF Demolition, 1 Middle/Senior High School, Approximately 74,697 SF Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents