Similar Projects
LFR-15 - Replace 18", 15" and 12" with 24" Line along Claiborne Run from Morton Road to Kings Hill Road - County of Stafford
Infrastructure
Conception
$3,612,000 CJ est. value
Fredericksburg, VA 22401

Eastern Shore Drive Lynnhaven Drive Pump Station - PG100150 - City of Virginia Beach
Renovation, Infrastructure
Conception
$9,587,700 CJ est. value
Virginia Beach, VA 23451

Main Street Pump Station and Plant - City of Newport News
Infrastructure
Design
$9,285,000 CJ est. value
Newport News, VA 23601

Eastern Shore Drive - Phase I - City Of Virginia Beach
Infrastructure
Design
$43,400,000 CJ est. value
Virginia Beach, VA 23451

Well Installation and Spring Abandonment
Infrastructure
Bidding
$30,000 CJ est. value
Gordonsville, VA 22942

Well Installation and Well Abandonment in Culpepper
Renovation
Bidding
$125,000 CJ est. value
Culpeper, VA 22701

Sewer and Grease Trap Pumping Services
Infrastructure
Post-Bid
Suffolk, VA 23434

Fawn Lake Pump Stations 27 And 58 Sewer Improvements
Renovation
Post-Bid
Spotsylvania, VA

Pump Station Repair Annual Services Contract
Term Contract
Results
Portsmouth, VA

Pump Station 153 Force Main Relocation
Renovation
Results
Newport News, VA

Savile Lane Pumping Station Rehabilitation Project
Renovation
Construction
$4,948,730 CJ est. value
McLean, VA 22101

Heritage Hunt Sewage Pumping Station, L52 Replacement, and Force Main Extension
Demolition, New Construction, Infrastructure
Construction
$26,423,957 CJ est. value
Gainesville, VA 20155

Western Pressure Zone Pump Station Backup Generator - 27503 - Town of Leesburg
Renovation
Conception
$661,500 CJ est. value
Leesburg, VA 20175

Eastern Shore Drive - Vista Circle Pump Station - PG100539 - City Of Virginia Beach
Infrastructure
Design
$18,100,000 CJ est. value
Virginia Beach, VA 23454

Well Installation and Well Abandonment in Middlebrook
Infrastructure
Bidding
$300,100 CJ est. value
Middlebrook, VA 24459

Reported 07/19/2023 12:00 AM
Project Title

Well Installation and Well Abandonment

Physical Address View project details and contacts
City, State (County) Cullen, VA 23934   (Charlotte County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $18,850 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cost for Line Item #1 (include total cost for items A-K). These are known factors. Vendors must invoice for actual cost incurred as described herein. The initial bid should be an average cost/foot of depth for 150 feet (add other itemized costs such as mobilization/setup, etc.). Please note: 150 feet is an estimate, vendor will bill based on actual service performed, actual depth drilled (as verified on the GW-2 and VDH's Record of Inspection). Vendor will only be paid for actual well depth drilled, casing depth, grout depth, depth of drop pipe, pump, etc. Vendor must provide a detailed bid for 150 ft., any additional footage must be listed as additional services at a per foot rate. Vendors who submit bids for over or under 150 feet; will not be accepted Well Installation and Well Abandonment

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents