Similar Projects
Minooka Ridge Business Park - Phase 1
New Construction, Infrastructure - 1,100,000 SF
Conception
$120,000,000 est. value
Minooka, IL

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Water Distribution System Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Braceville, IL 60407

2023 Street Maintenance
Infrastructure
Bidding
$800,000 CJ est. value
Diamond, IL 60416

Seal Coat
Infrastructure
Post-Bid
Morris, IL

HMA
Infrastructure
Post-Bid
Morris, IL

Airport Road Improvements
Infrastructure
Results
Morris, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

I-80 Logistics Park
New Construction, Infrastructure - 7,000,000 SF
Pending Verification
$700,000,000 CJ est. value
Minooka, IL 60447

I-80 Logistics Park
New Construction, Infrastructure - 7,000,000 SF
Pending Verification
$700,000,000 CJ est. value
Minooka, IL 60447

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Water Distribution System Improvements
Infrastructure
Bidding
$954,000 CJ est. value
Braceville, IL 60407

Crack Fill
Infrastructure
Post-Bid
Morris, IL

Engineering Services for Will Road Reconstruction - Phase II and Phase III
Infrastructure
Results
Diamond, IL 60416

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

Last Updated 05/02/2023 09:35 AM
Project Title

Streator Onized Credit Union / Morris

Physical Address View project details and contacts
City, State (County) Morris, IL 60450   (Grundy County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new credit union with a drive-thru. As of May 2, 2023, this project was seeking approvals with Morris Development Committee in April 2023. Information regarding an architect and a general contractor has not been released. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,800 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents