Similar Projects
Last Updated | 06/20/2023 10:06 AM |
Project Title | Expansion Joint Repair Jackson Correctional Institution |
Physical Address | View project details and contacts |
City, State (County) | Black River Falls, WI 54615 (Jackson County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Interior |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $414,915 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work consists of removing and replacing existing caulk or sealant along with backer rod material in expansion joints and other applicable building joints of seventeen masonry buildings at this campus, there will also be some mortar repair/replacement, and replacement of damaged clay masonry units. The facility has surplus stock of matching masonry units of each color present on the buildings. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. . All bids received from contractors who are not certified will be rejected. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |