Similar Projects
Warner Park Community & Recreation Center Expansion
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Madison, WI 53715

Police Department Renovation State Fair Park
Renovation - 9,000 SF
Sub-Bidding
$2,047,400 CJ est. value
Milwaukee, WI 53214

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Senior Center
Alteration
Post-Bid
Jefferson, WI 53549

The Tower Heritage Center Basement Waterproofing
Results
West Bend, WI 53095

Corridor Ceiling and Lighting Upgrade - Pulaski High School
Alteration
Results
Milwaukee, WI 53215

Shower Mixer Valves Replacement
Renovation
Sub-Bidding
$190,000 CJ est. value
West Allis, WI 53214

Ballistic Shutters
Alteration
Post-Bid
Milwaukee, WI 53210

Corridor Ceiling and Lighting Upgrade - South Division Multi-Plex
Alteration
Results
Milwaukee, WI 53204

Furniture for Step 2 Courthouse Remodel
Term Contract
Sub-Bidding
$258,120 CJ est. value
Waukesha, WI 53188

Mechanical Lab Wall Placement
Alteration
Post-Bid
Green Bay, WI

Building 3.1 Bid Package Flooring and Gypsum Board Assembly
Alteration
Results
Milwaukee, WI

Demountable Walls
Term Contract
Post-Bid
Madison, WI

Greenquist Hall Lab Fire Door Replacement - GPC
Alteration
Results
$620,000 est. value
Kenosha, WI 53144

Horizontal Louver Blinds (Commodity Only) for Phase 4A Townhomes (Westlawn Renaissance VII) at Westlawn Gardens Phase 2
Alteration
Post-Bid
Milwaukee, WI 53218

Last Updated 06/20/2023 10:06 AM
Project Title

Expansion Joint Repair Jackson Correctional Institution

Physical Address View project details and contacts
City, State (County) Black River Falls, WI 54615   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $414,915 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of removing and replacing existing caulk or sealant along with backer rod material in expansion joints and other applicable building joints of seventeen masonry buildings at this campus, there will also be some mortar repair/replacement, and replacement of damaged clay masonry units. The facility has surplus stock of matching masonry units of each color present on the buildings. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. . All bids received from contractors who are not certified will be rejected. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents