Similar Projects
Roof Replacement
Renovation
Sub-Bidding
$138,700 CJ est. value
Elk River, MN 55330

Roofing Replacement at Willmar District Headquarters
Renovation
Sub-Bidding
$3,252,800 CJ est. value
Willmar, MN 56201

2022 Multi-Site Partial Roof Replacement Oak Land Middle School
Alteration
Post-Bid
Stillwater, MN 55083

Humanities and Fine Arts Building Partial Re-Roofing
Alteration
Post-Bid
$235,170 est. value
Morris, MN 56267

Roof Replacement at John Carroll Apartments
Results
South Saint Paul, MN 55075

2021 Saint Paul Campus Roofing
Results
$3,556,806 est. value
Saint Paul, MN 55108

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Bid Package #1: Roofing
Renovation
Construction
$300,000 CJ est. value
Saint Paul, MN 55116

FY22 Roof Replacement
Renovation
Sub-Bidding
$700,000 CJ est. value
Saint Paul, MN 55107

Skyberg Hall Roof Replacement
Alteration
Post-Bid
$240,000 est. value
Crookston, MN 56716

JSC 98 Section Roof Replacement
Alteration
Results
$580,000 est. value
Hastings, MN 55033

Scattered Sites Roof Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Saint Paul, MN 55107

Becker County Highway Department Facility Roofing Bid Package
Alteration
Post-Bid
Detroit Lakes, MN 56501

Wayzata High School 2022 Partial Roof Rehabilitation
Alteration
Results
Plymouth, MN 55446

Buildings Roof Replacements
Renovation
Sub-Bidding
$1,280,000 CJ est. value
Winnebago, MN 56098

Hibbing Tanker Base Shingle Replacement
Alteration
Post-Bid
Hibbing, MN

Last Updated 05/08/2023 06:02 AM
Project Title

Doug Woog Arena Re-Roof Project

Physical Address View project details and contacts
City, State (County) South Saint Paul, MN 55075   (Dakota County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,175,080 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing of all labor and materials necessary to complete the design and specifications for the following project:Doug Woog Arena Re-roof Project This is a single lump sum bid contract and includes a number of project components including: removal and replacement of curved structural standing seam metal roof system and all associated components. Removal and replacement of metal wall caps. Removal and installation The bid bonds must be payable to the City of South St Paul in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The South St Paul City Council reserves the right to reject any or all bids, to waive any irregularities and informalities therein and to determine whether a bid is responsive or non-responsive. The City further reserves the right to award the contract to the best interests of the City.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents