Similar Projects
2021 Water Main Lining and Lead Service Replacement
Bidding
$1,981,000 est. value
Rochester, NY

General Construction for Consolidated Water District No - 1
Alteration
Bidding
Less than $10,000,000 est. value
Watertown, NY

East Main Street Water Main Installation
Post-Bid
Endicott, NY 13760

Furnishing and Delivering of Water System Materials
Post-Bid
Endicott, NY 13760

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Genesee County Phase 2 Water Supply Contract 2 Chestnut Ridge Road Water Main
Results
NY

Water Supply Improvements 2020
Alteration
Bidding
Plattsburgh, NY

Binghamton Housing Authority - Relocate Main Campus Utilities
Post-Bid
Binghamton, NY 13901

Sanitary/Water Replacement - Dupont Avenue and Colvinhurst Drive
Term Contract
Results
Kenmore, NY 14217

Hudson Hall Annex Di System Renovation
Infrastructure
Bidding
Plattsburgh, NY

Flow Meter Replacement
Post-Bid
Buffalo, NY 14202

Water System Improvements
Results
$1,750,000 to $1,900,000 est. value
Fredonia, NY 14063

Water and Wastewater Improvements
Alteration
Bidding
Greenville, NY

Water Meters and Automatic Meter Reading System
Post-Bid
Malone, NY 12953

Upgrade Domestic Water and Sewer Systems, Various Albany and Schenectady
Results
$2,000,000 to $3,000,000 est. value

Last Updated 06/01/2021 04:43 PM
Project Title

Cured in Place Rehabilitation of Water Mains 2021

Physical Address View project details and contacts
City, State (County) Rochester, NY   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,040,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of cleaning the interior of water main pipes of rust tubercles, deposits and other foreign matter and the rehabilitation of these water mains by inserting a new cured in place pipe (CIPP) structural lining within the interior of the existing pipe. Included in the contract is the supply and maintenance of temporary bypass pipe. Improvements to Milliner St. (Campbell St. to Jay St.), Packard St. (E. Main St. to Maxson St.), Perinton Street (Ridgeway Ave. to Wheatland St.), Chestnut Street (Court St. to Elm St.) and Aqueduct St. (E. Main St. to Broad St.).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents