Similar Projects
Popeye's Louisiana Kitchen
New Construction - 2,700 SF
Design
$500,000 to $1,000,000 CJ est. value
Richardson, TX 75081

Target #875
Renovation - 6,400 SF
Design
$500,000 est. value
Dallas, TX 75204

Replacement of Roof Vents, Gutters, Downspouts and Window Awnings
Post-Bid
Dallas, TX 75243

Solids Bay Column Repair
Post-Bid
Dallas, TX 75212

Construction of Briery Fueling Station Canopy
Results
$169,355 est. value
Irving, TX 75060

Utility Improvements for Highbridge Phase 2
Results
Dallas, TX 75206

Hawaiian Bros.
Renovation - 4,000 SF
Design
Addison, TX

Dallas Black Dance Theater Selected Exterior Restorations
Post-Bid
Dallas, TX 75201

Design-Build of the Dynamic Glass at Terminal D
Results
$6,300,000 to $8,300,000 est. value
Dallas, TX 75261

Security Vestibule Upgrades
Post-Bid
$850,000 est. value
Carrollton, TX 75006

Restoration of Amusement Water Slides
Term Contract
Results
Irving, TX 75063

ADA Transition Plan
Post-Bid
Mesquite, TX 75149

Seeton Road - Phase 2 Paving, Drainage, Water and Sanitary Sewer Improvements and Taaffe Creek Stream Stability Improvements
Results
$5,600,000 est. value
Grand Prairie, TX 75050

Maintenance, Repair, & Restoration of Outdoor Waterslides and Aquatic Features
Term Contract
Post-Bid
Dallas, TX 75201

Replace Greenhouse Shutters
Results
Less than $24,373 est. value
Dallas, TX 75252

Last Updated 10/08/2020 11:23 AM
Project Title

Terminals A, B, C, & E Waterproofing

Physical Address View project details and contacts
City, State (County) Dallas, TX 75261   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,986,962
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Terminals A, B, and E: 1. Removal and replacement of all exterior weathering sealants at the exterior walls, with the exception of the perimeter sealants at the concourse-level windows. 2. Installation of silicone overlays at select precast-to-precast joints. 3. Installation of silicone overlays at existing metal panel neoprene “zipper” gaskets. 4. Wet-sealing existing window gaskets at existing windows, with the exception of the concourse-level windows. This includes removal of existing window tint as required to perform wet sealing where required. 5. Installation of silicone overlays at existing lock-strip window gaskets. This includes removal of existing window tint as required to perform wet sealing where required. 6. Replacement of existing plastic glazing. 7. Concrete spall and hole repair. 8. Aesthetic crack repairs and coating at stucco. 9. Recoating of exposed metal embed plates. 10. Recoating of existing dark brown and dark grey metal panels. 11. Recoating of existing dark brown metal doors. 12. Remediation of asbestos containing materials (ACM).

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents