Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Raleigh Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
Charlotte, NC 28263

FY23 Small Diameter Water/Sewer Service Contract #2
Infrastructure
Design
$600,000 CJ est. value
Charlotte, NC 28202

Perth/Milton SDIP- City of Charlotte
Infrastructure
Design
$5,575,000 est. value
Charlotte, NC 28215

I-85 North Bridge Project
New Construction, Infrastructure
Bidding
$22,500,000 CJ est. value
Charlotte, NC 28216

Dixie River Road Watermain Extension
Infrastructure
Bidding
$400,000 CJ est. value
Charlotte, NC 28278

Brass Parts and Fittings
Term Contract
Sub-Bidding
Charlotte, NC 28202

Waterline Break Sediment Cleanup Service
Infrastructure
Post-Bid
Huntersville, NC 28078

Construction of Gem Street Extension
Infrastructure
Post-Bid
Cornelius, NC 28031

Progressive Design-Build Services for Pipeline Projects
Results
NC

FY21 Water Main Replacement - Contract 3
Results
$800,000 est. value
Charlotte, NC

Beckwith/Meadow Storm Drainage Improvement Project Phase 1 - City Of Charlotte
Infrastructure
Conception
$5,850,000 est. value
Charlotte, NC

Chatham SDIP - City of Charlotte
Infrastructure
Design
$9,655,000 est. value
Charlotte, NC 28205

Water Oak Storm Drainage Improvement
Infrastructure
Bidding
$8,309,717 CJ est. value
Charlotte, NC 28202

Ncsu - Integrative Sciences Building (Stem) Commissioning
Alteration
Post-Bid
$160,000,000 est. value

Last Updated 08/12/2022 04:19 AM
Project Title

RFP - Stormwater Master Plan Implementation - Phase 1

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28202   (Mecklenburg County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Commissioning, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Thank you for your interest in the subject project. This information is being provided to all firms which express an interest in the design of the project. Limit the size of your submittal document to no greater than 12 inches in height and 9 inches in width. Maximum 40 pages - including standard forms, cover letters, and University issued Submittal Cover Sheets, but excluding the cover, tabs, separators, clear covers, blank pages, or cardstock backs. Actual page counts will be derived from the electronic pdf submittal. Do not include covers, blank pages, tabs, separators, etc. in your electronic submittal. All submittals will be reviewed by the University Designer Evaluation Committee. The preliminary evaluation process will be conducted in August 2022 and firms selected for interviews will be notified at that time. Please deliver all submittals to Matthew Frazier at the address written above. Any questions about the project should be directed in writing to the Project Manager, Matthew Frazier at mfrazi31@uncc.edu. Please do not contact other UNC Charlotte staff. The method of contractor selection has not been determined at this time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents