Similar Projects
Brewery
New Construction
Conception
Fulton, IA

Poplar Avenue Traveler's Center
New Construction - 10,000 SF
Conception
Less than $6,000,000 est. value
Fort Dodge, IA 50501

Big Grove Brewery Development
Renovation - 77,232 SF
Design
Des Moines, IA 50309

NIACC Dining Hall Update
Renovation - 14,000 SF
Design
$5,000,000 to $10,000,000 est. value
Mason City, IA 50401

Starbucks Shell Building / Waukee
New Construction - 2,225 SF
Bidding
$600,000 est. value
Waukee, IA 50263

Starbucks
Build-Out - 2,281 SF
Post-Bid
Coralville, IA 52241

Scooter's Coffee
New Construction - 17,389 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Decorah, IA 52101

Peosta Taproom
New Construction
Results
$2,873,779 est. value
Peosta, IA

Des Moines Area Community College Legacy Plaza - Building 17 Brewery & Bar Relocation
Addition
Results
Ankeny, IA 50023

Target #T0533 - Cafe Remodel
Renovation - 1,565 SF
Construction
Davenport, IA 52807

Community Kitchen
Renovation
Construction
Dubuque, IA 52001

Spot 515 Development
Renovation - 12,100 SF
Pending Verification
Des Moines, IA

Burger King
Renovation - 3,791 SF
Pending Verification
Des Moines, IA 50314

Scooter's Coffee With Drive-Thru
New Construction - 669 SF
Design
Less than $500,000 CJ est. value
Des Moines, IA 50310

Scooter`S Coffee
New Construction - 668 SF
Post-Bid
Less than $500,000 CJ est. value
Centerville, IA 52544

Reported 07/01/2022 12:00 AM
Project Title

Chuck E. Cheese 655/Cedar Falls

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Sub-Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,851,252 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Interior and exterior finishes are being updated. A new video wall and LED dance floor are being added. New furniture and décor are included. Trades include: Concrete Cutting, Concrete Patching, Carpentry (we bundle light demo, rough carpentry, finish carpentry, drywall, metal stud framing and acoustical ceilings under one contract on these remodels), EIFS, Storefront, Ceramic tile, Carpet Labor, Interior Painting, Exterior Painting, Wall Texture Patching, Drywall Finishing, Plumbing, and Electrical.

Details

Food/Beverage Service, 1 Story Above Grade, 11,867 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents