Similar Projects
Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

Wooley Avenue Reconstruction - City of McCall
Infrastructure
Conception
$1,625,000 CJ est. value
McCall, ID 83638

2nd Street Mixed-Use
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
McCall, ID 83638

Maverik / McCall
Demolition, New Construction, Infrastructure - 5,041 SF
Design
$3,000,000 CJ est. value
McCall, ID 83638

Lift Station 52 Bypass Project
Infrastructure
Post-Bid
$850,000 CJ est. value
McCall, ID 83638

RFP Design - Architectural proposals - New Hospital
New Construction, Infrastructure
Post-Bid
$19,500,000 CJ est. value
Cascade, ID 83611

Reconstruct Taxiway E McCall Municipal Airport
Infrastructure
Results
$617,583 CJ est. value
McCall, ID 83638

Krahn Lane Self-Storage / McCall
New Construction, Infrastructure - 30,050 SF
Pending Verification
$3,200,000 CJ est. value
McCall, ID 83638

Quaker Hill Conference Center Renovation / McCall
Addition, Demolition, Renovation, Infrastructure - 9,752 SF
Pending Verification
$800,000 CJ est. value
McCall, ID 83638

Apron Reconstruction - 2956-2018-04 - City of McCall
Infrastructure
Conception
$1,300,000 CJ est. value
McCall, ID 83638

Apron Construction - Rehabilitate Hangar Taxiways - 2956-2018-07 - City of McCall
Renovation, Infrastructure
Design
$950,000 CJ est. value
McCall, ID 83638

RFQ D/B - Utility Building/Garages, Lake Cascade State Park
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Cascade, ID 83611

Big Horn Residential Development
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
McCall, ID 83638

Infield Development Area Taxiways - 2956-2022-07 - City of McCall
Infrastructure
Conception
$800,000 CJ est. value
McCall, ID 83638

Boydstun Place Subdivision
New Construction, Infrastructure - 19,250 SF
Design
$5,000,000 CJ est. value
McCall, ID 83638

Last Updated 08/14/2023 10:03 AM
Project Title

McCall Field Campus

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $39,440,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 14 2023, this project is in conceptual design. *The closed solicitation has been included below for reference: The University of Idaho is seeking qualifications from interested Architectural Consultant firms to assist the university in the programming, planning, and predesign of various desired facilities to be located at the university's McCall Field Campus in McCall, Idaho. The university envisions that these new facilities will support the educational, research and outreach mission of the McCall Field Campus, and will reflect the character and heritage of the McCall campus. The university desires to make innovative use of wood products and materials, to potentially include mass timber construction techniques and materials sourced from Idaho's Forest Products industry and vendors. In addition, the university is interested in the exploration that potentially these facilities meet the standards outlined by Living Building Challenge (LBC), that they act as a "teaching tool for sustainability," through economical, highly functional, energy efficient, and economically maintainable design. These new facilities are to be located at the McCall Field Campus of the University of Idaho, on the shores of Payette Lake in McCall, Idaho. The university previously completed a Master Plan for the McCall Field Campus and more recently completed a new Restroom and Shower House facility. The intent is to now plan and program the next iteration of facilities responsive to the master plan. The end product of the work envisioned under this Request for Qualifications is a robust, fully developed architectural program - a Project Planning Guide (PPG) - for one or more of these desired facilities. The envisioned PPG Document will fully describe the goals, objectives, opportunities, constraints, characteristics, and vision for these facilities. The PPG is envisioned to include, amongst other items, an architectural program, functional relationship diagrams, room data sheets, site and infrastructure relationships and improvements, materiality, programming-level construction costs estimates, and project schedule milestones. Renderings and other materials in support of fundraising efforts may be requested. The end goal is that the completed Project Planning Guide document is to be used as a basis of understanding of the project amongst the project stakeholders, as a vehicle to help support and facilitate fundraising, and as a foundation for the eventual design and construction of the desired facilities The initial authorization by the Board of Regents of the University of Idaho for this effort is limited to the programming, planning, and predesign phases of the overall design and construction process, i.e.: the development of the desired Project Planning Guide(s). Upon successful completion of the programming, planning, and predesign phases, and the completion of a successful capital strategy for funding the facilities, it is the intent of the University of Idaho to seek authorization to proceed with the design phase. The university may elect to proceed into the design phase, and eventually the construction phase, with the successful respondent to this Request for Qualifications. Or the university may, at the universitys option, elect to issue a separate, follow-on Request for Qualifications. Any questions which arise from this request, shall be addressed to: Daryle Faircloth, Project Architect & Manager Architectural & Engineering Services University of Idaho Moscow, Idaho 83844-2281 (208) 885-6246 darylef@uidaho.edu The initial contract is envisioned to be for the planning, programming, and predesign phase services. Additional design, bidding, award, and construction phase services may be required at the universitys discretion. As noted, such additional services are contingent upon additional authorization by the University of Idaho Board of Regents. Program clarification and additional data may be requested by phone or by e-mail. The university respectfully requests that interested A/E firms limit their contacts to the named individual and contact only this person in the interest of maintaining a consistency of response and fairness to all respondents. Please make no contact with other members of the university, except regarding certain items as specifically directed herein. The method of contractor selection has not been determined at this time As of April 6, 2022, the due date and time has been confirmed with the owner.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents