Similar Projects
Last Updated | 09/22/2021 12:44 PM |
Project Title | Green House Maintenance Fort Collins, Co Base Year , Plus 4 Option Years |
Physical Address | View project details and contacts |
City, State (County) | Fort Collins, CO (Larimer County) |
Category(s) | Animal/Plant/Fish Facility |
Sub-Category(s) | Animal/Plant/Fish Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor will be responsible to perform preventive maintenance to four greenhouse components and peripheral equipment. The work will consist of a quarterly visit to clean, lubricate, inspect, and complete minor repairs related to the tasks listed below: Inspect and clean exhaust fans. Replace belts as required. Clean fan blades associated with exhaust fans, lubricate motors and bearings as needed. Inspect guillotine vents. Replace worn shaft hangers, shaft and rack pinions associated with ridge vent. Inspect and replace worn vent rack and pinions (gearing for ridge vent). Grease as required. Inspect and repair curtain system. This includes billow lines, drive system, racks and pinions as required. Grease gears in green houses located in the corridors of the greenhouses. Clean bug screen. Inspect serviceability of screen. Clean outside gutters every quarter. Inspect roof panels. Tighten fasteners on panels and caps. Repair foam closures and reseal with silicone if required. Replace faulty brackets on sash areas. Replace bracket, as necessary. All screens associated with green houses will be washed and reinstalled. Contractor will report all torn or broken screens in after actions report. The contractor will submit a detailed list of discrepancies found and recommend repairs as needed during discovery of broken or failing components that are not covered during quarterly preventive maintenance of equipment. |
||||||||||||||||||
Details | Animal/Plant/Fish Facility, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |