Similar Projects
Last Updated | 05/22/2023 05:10 AM |
Project Title | Replace Light Bulbs, Main Exchange, B3918 |
Physical Address | View project details and contacts |
City, State (County) | Cherry Point, NC 28533 (Craven County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Public Works Project No.: 7221277 Title: MAIN EXCHANGE, B3918 NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $39.5 Million Contract Completion Date: All work shall be completed within 180 calendar days after award. Estimated Cost Range: Between $25,000 and $100,000. Wage Determination: General Decision Number: NC20230065 01/26/2023 Liquidated Damages: $37.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Monday 10 April 2023 at 1000. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE. o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. REPLACE LIGHT BULBS, REQUEST FOR PROPOSAL MAIN EXCHANGE, B3918 MCAS Cherry Point, North Carolina Project No. 7221277 FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. DFARS 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region--Certification, which includes a certification requirement stated below. DFARS 252.225-7060, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region, which prohibits contractors from providing any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs. Please either return an email or add the certification statement on your proposals stating the following: "Certification from (Please enter your company name here) that you have made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract resulting from this solicitation" Proposal Due Date: 27 April 2023, 1200 local time E-Mail Address for Proposals: 1. roicc_chpt_ktr_bids@navy.mil 2. joanna.d.miller2.civ@us.navy.mil 3. ericka.j.bishop.civ@us.navy.mil Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 17 April 2023 by 0900 in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |