Similar Projects
Last Updated | 04/13/2023 04:05 PM |
Project Title | Fiscal Year 2021 Proposition 101 Local Streets, Package 7 |
Physical Address | View project details and contacts |
City, State (County) | Tucson, AZ 85705 (Pima County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $9,169,853 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of March 20 ,2023 this project has not yet been awarded. A timeline for award has not yet been established.** CONTACT: Maritza Felix, Senior Contract Officer PHONE: (520) 837-4107 The Engineer shall be immediately notified if there are changes in the dates and times of the posted NoParking signs. The Contractor shall change the posted signs to read the revised dates and time, and redistribute a revised notification letter to affected residents. No work shall be allowed to commence unless the conditions and requirements of this specification section is adhered to. Failure of the Contractor to abide by this specification section shall be sufficient grounds for the City of Tucson to suspend work. Re-posting of street postings, distribution of notices, and re-mobilization shall be performed by the Contractor per the requirements of the special provisions and these specifications. Contractor shall be charged for the working days for the suspension of the work, including re-posting, re-distributing of notices, all mobilization and demobilization for this scope of work at no additional cost to the City of Tucson. There shall be no separate pay item for the cost of the resident notification and shall be included as a part of the overall project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |