Similar Projects
Well Drilling Services
Bidding
Merrimac, WI

Well Rehabilitation and System Cleaning
Infrastructure
Bidding
$110,000 est. value
Eagle, WI 53119

Sump System Installation
Post-Bid
Two Rivers, WI 54241

2020 Waste Activated Sludge Pump
Post-Bid
Madison, WI 53713

Rehabilitation of Wells 15 and 17 at City Well Field
Results
Eau Claire, WI 54701

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Municipal Well 4 - Well Construction
Results
Wausaukee, WI 54177

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

Drilling Observation Services
Renovation, Term Contract
Post-Bid
Oconomowoc, WI 53066

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

Well 10 Maintenance and Rehabilitation
Infrastructure
Post-Bid
Burlington, WI 53105

Pump House No.10 Improvements
Results
Muskego, WI

Well Station No. 5 Reservoir Roof Repair and Pump Replacement
Infrastructure, Alteration
Post-Bid
$300,000 est. value
Pewaukee, WI

Last Updated 10/14/2021 10:08 AM
Project Title

Wellhouse 3 Treatment Equipment

Physical Address View project details and contacts
City, State (County) Omro, WI 54963   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installing a steel horizontal pressure filter, electromagnetic flow meter, air wash blower, valves, ductile iron process piping, chemical feed system for the addition of hydrous manganese oxide (HMO), electronic scale, chemical tank, mixer, electronic metering pump, booster pump, electrical, controls, as well as concrete containment curb, underground piping and turf restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents