Similar Projects
Grace Library & Museum Building
New Construction - 85,000 SF
Design
Wilmington, NC 28401

67KV Delta to 13.09Y / 7.56KV Wye With LTC 24/32/40MVA Power Transformers for Cumberland Road Substation
Infrastructure
Design
$700,000 CJ est. value
Fayetteville, NC 28306

Mast Arm Poles
Term Contract
Sub-Bidding
Castle Hayne, NC 28429

Waste Collection and Recycling (8 Yard Service) - Rebid 2
Term Contract
Sub-Bidding
Winston Salem, NC 27101

F--GRSM_Hemlock_Service_Fy21
Term Contract
Post-Bid

F--GRSM_Hemlock_Service_Fy21
Term Contract
Post-Bid

Archives and History Building Foundation Repairs and Drainage Improvements
Renovation, Infrastructure
Results
$965,000 CJ est. value
Raleigh, NC 27601

Toilet Room Renovations
Renovation
Results
Beaufort, NC 28516

Rolloff, Compactor Services and Hauling
Term Contract
Sub-Bidding
Raleigh, NC 27601

Latrines / Hand Washing Stations / Gray Water Tanks / Dumpster
Term Contract
Post-Bid
Fort Bragg, NC

Utilities Easement Maintenance - Rebid 2
Term Contract
Sub-Bidding
Winston Salem, NC 27101

FY22 Portable Toilets
Term Contract
Post-Bid
Rocky Mount, NC

Southern Terrace Vegetative Debris and Sediment Removal
Term Contract
Sub-Bidding
Havelock, NC 28532

Pest Control Service for Mattamuskeet Lodge
Term Contract
Post-Bid
NC 27885

Pollocksville US 17b Streetscape Planting in Jones County
Term Contract
Sub-Bidding
Trenton, NC 28585

Last Updated 08/11/2022 02:06 PM
Project Title

Museum of the Albermale CCTV System Replacement

Physical Address View project details and contacts
City, State (County) Elizabeth City, NC 27909   (Pasquotank County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Museum, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the building CCTV system. Bids will be received for single prime bid contracts. All Proposals will be lump sum. The full plan deposit will be returned to contractors not submitting bids provided all documents are returned in good condition at least ten (10) days prior to the bid date. To receive a complimentary electronic copy of contract documents and to be placed on the distribution list, please send the following information to Maria Spittler, e-mail: maria@sudassociates.com. Name and e-mail of individual, Company Name, Address, Web Site, Telephone Number and Fax Number Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of (30) days. The time for completion of the Work shall be 120 consecutive calendars days from the date of the Notice to Proceed to Final Acceptance Liquidated damages shall accrue at the rate of $100.00 per day for each calendar day in excess of the number of calendar days designated in Article 23.a The state reserves the unqualified right to reject any and all proposals. The owner reserves the right to reject any or all bids and to waive informalities. To ensure a fair bidding process, questions and/or clarifications requested by contractors will not be accepted after an established cut-off date. A cut-off date of July 25, 2022, at 5:00 P.M. was established. Contractors are encouraged to e-mail their questions as they have them, and not hold them until later to; Project Manager: Michael J. Szigeti Phone: (336) 327-6123 E-mail michael@sudassociates.com

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents