Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Post-Bid
MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Chip Seal Scrub Seal Vaughn To Dutton Great Falls Area
Infrastructure
Post-Bid
Dutton, MT

Hudson Bay Divide South
Infrastructure
Results

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Last Updated 02/23/2022 04:32 PM
Project Title

Road Surfacing and Realignment

Physical Address View project details and contacts
City, State (County) MT   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction activities to include the furnishing of labor, equipment, supplies, and materials, to grade, shape, water, and surfacing of 4.5 miles of road, realignment and surfacing of 0.57 miles of road, and other related work in accordance with the drawings and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents