Similar Projects
Replace Domestic Water Heaters
Term Contract
Bidding
Shepherdstown, WV 25443

HVAC Units for Grant County HQ and Breakroom 05210364
Alteration
Bidding
Petersburg, WV 26847

AC Repair Clarksburg, WV
Post-Bid
Clarksburg, WV

Chiller Rebuild - WV Visiting Nurse Facility
Post-Bid
Clarksburg, WV

Z--Eye Clinic HVAC Replacement Project Number 540-19-104
Results
$250,000 to $500,000 est. value
Bridgeport, WV 26330

HSC BAC Cooling Tower Refurbishment (2nd Half)
Results
Morgantown, WV 26506

Building 1 Room M146 Office HVAC Units
Alteration
Bidding
Charles Town, WV

Mini Split System Repair in Server Room - Martinsville, WV 26155
Post-Bid
New Martinsville, WV 26155

Touchdown Terrace Chiller Replacement
Results
Morgantown, WV 26506

Tygart Lake State Park - Lodge HVAC Replacement
Alteration
Bidding
Grafton, WV 26354

Chiller and HVAC Full Service Comprehensive Contract - Joan C. Edwards School of Medicine
Post-Bid
Chapmanville, Huntington, WV

Replacement of AHU's 5 and 6 at CAC
Results
Morgantown, WV 26506

Building 5 DA Tank and Elevator Cooling Unit Repairs
Alteration
Bidding
Charleston, WV

Chiller Maintenance and Repair Services - Physical Plant Comprehensive Chiller Maintenance and Repair Services
Post-Bid
Huntington, WV 25755

HVAC Maintenance - Veterans Nursing Facility
Term Contract
Results
$30,239 est. value
Clarksburg, WV 26304

Last Updated 06/25/2021 10:14 AM
Project Title

Municipal Building First Floor HVAC Project

Physical Address View project details and contacts
City, State (County) Parkersburg, WV 26101   (Wood County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Provide and install one (1) VRF system with condenser and thirteen (13) ceiling units. VRF condensing units will have two equally sized fully inverter driven compressors to allow the condensing unit to isolate one compressor and run at 50% capacity while repairs are performed. Condensing unit will deliver at least 82% or nominal heat at 10FWB ambient temperature. Compressor must be capable of controlling speed in 0.1 Hertz increments. When indoor unit reaches setpoint, the electronic expiation device will be capable of closing 100% to prevent refrigerant leak through the expansion device and possibly overcooling or overheating the space. System minimum efficiency will be 26.6 IEER, 33.6 SCHE and 3.75 COP. • Provide and install refrigerant piping from condenser to thirteen (13) ceiling units. • Install ball valves on all units for isolation. • Provide and install control wiring to condenser and ceiling units. • Provide and install thermostat controls for ceiling units. • Pressure test evacuate and charge system. • Perform start-up and operational check.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents